Bellemont Fire Station Addition

Bellemont Fire Station Addition. CENE 476 12/7/2018 Abdullah Alkhayat Lionel Goy Jocelyne Rivas  Marc Wasserman. Figure 1. Google maps street view of Ponderosa Fire Department [1]. Purpose Fire department needs more space for: Housing firefighters Hosting community events

jsyed
Download Presentation

Bellemont Fire Station Addition

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bellemont Fire Station Addition CENE 476 12/7/2018 Abdullah Alkhayat Lionel Goy Jocelyne Rivas  Marc Wasserman Figure 1. Google maps street view of Ponderosa Fire Department [1].

  2. Purpose • Fire department needs more space for: • Housing firefighters • Hosting community events • Conducting town meetings • Storing the Chief’s fire truck Client • Town of Bellemont/Chief Antonides Bellemont N Figure 2. Map of Arizona with location [1].

  3. Pilot Travel Center Background • Location: Bellemont, Coconino County, Arizona • Existing Fire Station was built in 2006 and re-named Ponderosa Fire Station 82 Ponderosa Fire Department Single Family Housing I-40 Shadow Mtn Dr. I-40 N Figure 3. Close up location map of the Ponderosa Fire Department location [1].

  4. Scope of Services • Task 1.0: Site Investigation • Task 1.1: Obtain Plan Sets • Task 1.2: Survey Land • Task 1.3: Soil Sampling • Task 1.4: Survey Data • Task 2.0: Soil Testing • Task 3.0: Metal Framing Company Research • Task 3.1: Cost Research  • Task 3.2: Decision Matrix Figure 4: Land Surveyors [2].

  5. Scope of Services Task 5.0: Construction Documents Task 5.1: Site Plan Task 5.2: Utility Locations Task 5.3: Foundation Plan and Details Task 5.4: Anchor Bolt Plan and Details Task 5.5: Floor Plans • Task 4.0: Structural Design  • Task 4.1: Design Perimeters • Task 4.2: Foundation Design  • Task 4.3: Anchor Bolt Design • Task 4.4: Floor Design

  6. Scope of Services • Task 7.0: Project Management • Task 7.1: Team, Client, Technical Adviser, and Grading Instructor Meetings • Task 7.2: Construction Cost • Task 7.3: Schedule • Task 7.4: Project Deliverables • Task 6.0: Project Deliverables • Task 6.1: Meeting Memo Binder • Task 6.2: 30% Report • Task 6.3: 60% Report • Task 6.4: Final Report • Task 6.5: Presentation  • Task 6.6: Website

  7. Exclusions • Structural Frame Design of the Addition • Drainage Plan  • Electrical Plan • Mechanical-  Heating, Ventilation, Air Conditioning (HVAC) • Building Permits

  8. Figure 5. Gantt Chart for the Fire Department project.

  9. Figure 6. Critical path for the project.

  10. Table 2. Staff hours breakdown per task.  Staffing Table 1. Staff abbreviation code.

  11. Cost of Engineering Services Table 3. Total estimated project cost of services.

  12. References: [1] Google Maps, [Online]. Available: https://www.google.com/search?client=firefox-b-1-ab&q=ponderosa+fire+station&npsic=0&rflfq=1&rlha=0&rlla. [Accessed 8 November 2018]. [2] Harbor Compliance, "Arkansas Land Surveyor License," [Online]. Available: https://www.harborcompliance.com/information/arkansas-land-surveyor-license-permit. [Accessed 8 October 2018].