Southern African Power Pool. SESSION 3: OVERVIEW. Power Pool Members . Angola Botswana Democratic Republic of Congo (DRC) Lesotho Malawi Mozambique Namibia South Africa Swaziland Tanzania Zambia Zimbabwe . Power Pool Overview (1) . SAPP was set up in August 1995
E N D
Southern African Power Pool SESSION 3:OVERVIEW
Power Pool Members • Angola • Botswana • Democratic Republic of Congo (DRC) • Lesotho • Malawi • Mozambique • Namibia • South Africa • Swaziland • Tanzania • Zambia • Zimbabwe
Power Pool Overview (1) • SAPP was set up in August 1995 • Main objectives: • Provide forum for the development of a world class, robust, safe, efficient, reliable and stable interconnected electrical system in Southern African region. • Optimise the use of available energy resources in the Southern African region and support one another during emergencies. • Key activities undertaken so far: • Established the short-term energy market (STEM) in April 2001. • Completed SAPP telecommunications study in 2001 with implementation of the recommendations following in 2005/6. • Frequency relaxation project completed & implemented in 2003. • Transmission wheeling tariffs implemented in phases from January 2003 to January 2006. • Quality of supply database implementation in progress • Interconnectors: Zimbabwe-Botswana-South Africa (1995), South Africa-Swaziland-Mozambique (2001), Mozambique-Zimbabwe (1997), Namibia-South Africa (2002), Namibia-Zambia (2006).
Power Pool Overview (2) • Next key activities planned: • Development and implementation of the SAPP competitive electricity market: Jan 2004 to Dec 2007. • Transmission pricing policy, ancillary services market development and implementation procedures: May 2005 to Feb 2007. • Development of a balancing mechanism: June 2007 • Implementation of the SAPP priority generation & transmission projects: From Jan 2006
Upcoming Key Projects in the SAPP (I) Nr. Project name Country (ies) Type(1) Est. cost ($M) Est. Readiness 1 Malawi-Mozambique Interconnector 330kV Malawi and Mozambique TRANS US$ 90 Million March 2007 2 Itezhi-Tezhi [ 120MW ] Zambia HYD GEN US$ 142 Million March 2007 3 Kafue Gorge Lower [ 750MW ] Zambia HYD GEN US$ 600 Million June 2007 4 Inga 1 and 2 DRC REHAB US$452 Million Financing Gap Ready (1) Key: REHAB: rehabilitation and expansion project – HYD GEN: hydropower plant – GAS GEN: gas-fired generation project DIV GEN: other type of power plant – TRANS: transmission project – DIST: distribution project – OTHER: other type
Upcoming Key Projects in the SAPP (II) Nr. Project name Country (ies) Type(1) Est. cost ($M) Est. Readiness 5 Kariba North and South Extensions [360 + 300 MW] These are extension physically joined to the existing facilities. Zambia and Zimbabwe HYD GEN USD 500 Millions Ready 6 Zambia-Namibia-Zimbabwe 330kV Interconnector Namibia, Zambia and Zimbabwe TRANS US$ 200 Millions December 2007 7 Hwange Expansion [ 600 MW ] Zimbabwe DIV GEN US$ 500 Million Ready 8 Kudu [ 800 MW ] Namibia GAS GEN US$ 1,200 Millions Ready (1) Key: REHAB: rehabilitation and expansion project – HYD GEN: hydropower plant – GAS GEN: gas-fired generation project DIV GEN: other type of power plant – TRANS: transmission project – DIST: distribution project – OTHER: other type