An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SWG Report to TAS August 20, 2009 Marv Landauer

  2. SWG Report to TAS 2009 Study Program Update • 2012 Study Results • 2019 Resource Gap Development • 2019 Transmission Assumptions • 2010 Study Program

  3. SWG Report to TAS 2010 Study Program • SRWG basecases • Long Range Tool • Revamped West wide Planning Process • Others?

  4. SWG Report to TAS • Transmission Task Team Activities • Peter Krzykos is leading • Provide list of transmission projects to add to 2012 case to make 2019 case • Provide input to SRWG on 2020 case • Develop overlay options for 2029 studies • Coordination with SRWG on basecases

  5. SWG Report to TAS Factors used to determine transmission added to 2019 case • All transmission in 2012 case plus projects that could cause bulk grid flow changes (500 kV and 345 kV mostly, some 230 kV in east) with evaluation of following attributes: • Under construction • Status of permitting activities • Sponsor commitment • Congestion identified in previous studies • WECC Rating Phase • Local Reliability Issue • Parallel projects

  6. 2019 Transmission Additions • Nicola-Meridian #2 • I-5 Corridor (South of Allston) • McNary-John Day • Central Ferry-Lower Monumental • Hemingway-Boardman • Montana-Alberta Transmission line (MATL)

  7. 2019 Transmission Additions • Mona-Oquirrh • Populus-Terminal Project • Sigurd-Red Butte • Gateway South • single circuit only • TOT3 Archer • Path 36 (TOT3, Miracle Mile-Ault) • Hughes Transmission Project • South of Wyodak

  8. 2019 Transmission Additions • Lake Elsinore to SCE • NOT including extension to SDG&E • Devers-Colorado River Substation • NOT including extension to Palo Verde • Green Path North (Indian Hills- Upland) • Sunrise Power Link • Path 54 (Springerville) • Path 51 (Southern Navajo)

  9. 2019 Transmission Additions • 2019 Path Uprates • Path 3 Uprate (BC-NW) • Brownlee Uprate • Midpoint-Summer Lake Uprate • Path 27 Uprate (Intermountain DC line) • EOR 9300 MW Uprate • All other proposed projects included in congestion relief toolbox

  10. SWG Report to TAS • UpcomingSWG conference calls: • September 9th, 12-4 PAST • September 29, 8:30 to 3 PAST