Stave 09/250. Define (redefine?) purpose What it is What tests Where and by whom: components are built assembled t ested Schedule. Purpose?. Full size prototype to test Electrical Operation Group’s Ability to Assemble De-bug Disassemble Handle Ship
E N D
Stave 09/250 • Define (redefine?) purpose • What it is • What tests • Where and by whom: • components are built • assembled • tested • Schedule
Purpose? • Full size prototype to test • Electrical Operation • Group’s Ability to • Assemble • De-bug • Disassemble • Handle • Ship • Determine Practicality of Design • Mechanical Performance
What is it • 1.2m? • With ‘side mounted’ EoS ? • EoS ? • Edge/Double-edge Mounted ? • Mounted to what ? Shipped in what? • Ti or stainless pipes ? Fittings ? • Style of tape (reference/shield) • Serial or DC-DC • HV grouping
What Tests • Electrical operation • Noise f(module location) • f(proximity) • f(grounding) • f(cable length) … • Mechanical Performance? • Distortions under different conditions • Normal power fluctuations during triggering/read-out • Various failure modes
Schedule • Define Stave (inclcore,module,power…) 1/4/12 • Fabricate Core/test 1/5/12 • Modules fabricated/test 1/7/12 • EoS / DAQ / Power / HV 1/5/12 • Attach modules 1/8/12 • Testing start Sept ‘12
Who and Where • Core • Modules • EoS • DAQ • Shipping Container & Test Stand • Power supplies