1 / 20

Electric Transmission Energy Summit April 22, 2008

Electric Transmission Energy Summit April 22, 2008. Index. Interconnection Requirements & Procedures Overview NWE transmission Constraints Transmission Needs. Index. Interconnection Requirements & Procedures Overview NWE transmission Constraints Transmission Needs. Interconnection.

kalb
Download Presentation

Electric Transmission Energy Summit April 22, 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Electric TransmissionEnergy SummitApril 22, 2008

  2. Index • Interconnection Requirements & Procedures • Overview NWE transmission • Constraints • Transmission Needs

  3. Index • Interconnection Requirements & Procedures • Overview NWE transmission • Constraints • Transmission Needs

  4. Interconnection • Interconnection vs. Transmission Service • FERC • Differences • Application (MW, Online date and technical data) • Fee • Queue Priority by Application Date

  5. Interconnection • Study • High Level and Detail Reliability Studies • Facility Study • Restudy potential • Interconnection Agreement • Does not constitute a request for transmission service • Does not imply that you will receive any transmission required to deliver the generation output to load • Construction • Generation Facility • Transmission Mitigation • More detail on NWE OASIS website • http://www.oatioasis.com/nwmt

  6. Interconnect Timelines - Example

  7. Index • Interconnection Requirements & Procedures • Overview NWE transmission • Constraints • Transmission Needs

  8. Operate In An Extensive Network • WECC area • NWPP area • Sub-Regional areas • State • Local

  9. Regulation & Requirements • Federal • Regional • State • Reliability • Customer Needs

  10. NWE Transmission

  11. Index • Interconnection Requirements & Procedures • Overview NWE transmission • Constraints • Transmission Needs

  12. Why Is New Transmission Needed?

  13. Paths

  14. Paths

  15. Index • Interconnection Requirements & Procedures • Overview NWE transmission • Constraints • Transmission Needs

  16. MSTI – Example Route

  17. Internal Collector System - EXAMPLES

  18. Internal Collector System - EXAMPLES • Build Out Conundrum • Encourage Participation • Example of potential options • New 230 kV - approx 450 MW • 500 kV Upgrade - approx 500 MW • Free Rider • See “NorthWestern’s Interconnect Cost Allocation and Refund Methodology” posted on NWE OASIS Build First Apply First

  19. External “Collector” System for MSTI

  20. Questions?