CROZET ELEMENTARY SCHOOL SITE IMPROVEMENTS January 14, 2010 Heyward Boyd Architects, PC

CROZET ELEMENTARY SCHOOL SITE IMPROVEMENTS January 14, 2010 Heyward Boyd Architects, PC. PROJECT GOALS Increase safety of students by separating bus unloading and parent pick-up/drop off areas Maintain existing levels of parking or increase if possible. DESIGN COMMITTEE.

kalin
Download Presentation

CROZET ELEMENTARY SCHOOL SITE IMPROVEMENTS January 14, 2010 Heyward Boyd Architects, PC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CROZET ELEMENTARY SCHOOLSITE IMPROVEMENTS January 14, 2010 Heyward Boyd Architects, PC

  2. PROJECT GOALS • Increase safety of students by separating bus unloading and parent pick-up/drop off areas • Maintain existing levels of parking or increase if possible

  3. DESIGN COMMITTEE Karen Marcus – Principal Barbara Albertson – School Bus Coordinator Bonnie Hagerman – PTO Representative Sheri Wilkerson – County Schools Fleet Management Joe Letteri, Lisa Glass – County Schools Building Services Neale Craft, Montie Breeden – County Facilities Development Jim Boyd, Patricia Jessee – HB Architects, PC John Hash – Timmons Group

  4. EXISTING ISSUE Crossing bus and parent traffic during loading and unloading

  5. EXISTING SITE PLAN

  6. Bus Loading Zone EXISTING SITE PLAN

  7. Bus Loading Zone Parent Parking & Drop-off Area EXISTING SITE PLAN

  8. Bus Loading Zone Parent Parking & Drop-off Area EXISTING SITE PLAN

  9. DESIGN STRATEGY Separate bus and parent loading by creating new parent drop-off/ pickup loop at the lower level of the school.

  10. PROPOSED PLAN

  11. Remove existing rear parking lot, relocate (4) mobile classrooms to other schools. DEMO PLAN

  12. PROPOSED DESIGN Front Loop: Bus loading will continue in existing manner.

  13. DROP-OFF LOOP

  14. PROPOSED DESIGN • New Parent Drop-off Loop: • avoids children and parents walking through bus line • expands current parking capacity by 17 spaces • improves vehicle stacking capacity • provides opportunity to improve drainage problems at new loop area • maintains access to athletic fields beyond • will be fenced off from play areas • uses existing covered space as Vestibule

  15. EXISTING CONDITIONS • New Student Vestibule – • Provides for proper supervision of waiting students • Re-purposes existing covered space

  16. VESTIBULE ELEVATION New Storefront at Existing Roofed Area

  17. GREEN FEATURES • Improved storm water management with bio filter • New air lock at vestibule entrance to reduce energy costs • Efficient site lights at new drop-off loop to meet County requirements and Dark Skies Ordinance

  18. PROJECT BUDGET & SCHEDULE Construction Budget - $360,000 Project will include bid alternates, including portion of new parking spaces as rear. Project Schedule – Complete construction drawings – mid spring 2010 Receive bids – late spring 2010 Construction – complete summer 2010 If necessary, new rear loop work can extend into 2010 school year without affecting daily school operations.

  19. SITE IMPROVEMENTS