BU224: Microeconomics Unit 6 Seminar

BU224: Microeconomics Unit 6 Seminar. Tutor Center: http://khe2.acrobat.com/kubc/ (Check the Business Tutor Center Link) Greg Evans, PhD. Unit 6 Seminar Agenda. Chapter 11: Behind the Supply Curve: Inputs and Costs “Theory of Production and Costs” “Production, Costs and Supply”.

kamana
Download Presentation

BU224: Microeconomics Unit 6 Seminar

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BU224: MicroeconomicsUnit 6 Seminar Tutor Center: http://khe2.acrobat.com/kubc/ (Check the Business Tutor Center Link) Greg Evans, PhD

  2. Unit 6 Seminar Agenda • Chapter 11: Behind the Supply Curve: Inputs and Costs • “Theory of Production and Costs” • “Production, Costs and Supply”

  3. Behind the Supply Curve: Inputs and Costs • The various types of costs a firm faces • Goals: • Understand how a profit-maximizing firm chooses the optimal quantity of output • Understand the costs of production relationships between input and output

  4. The Production Function • The purpose of a firm is to turn inputs into outputs • A production function is the relationship between the quantity of inputs a firm uses and the quantity of output it produces • Output = f(labor, capital, inputs, technology)

  5. Inputs and Output: Short run and Long run • The short run: the time period in which at least one input is fixed. (fixed inputs + variable inputs) • The long run: the time period in which all inputs can be varied. (all inputs are variable inputs) • Short run and long run varies from firm to firm

  6. Fixed Inputs vs. Variable Inputs • In the Short run a firm faces: • A fixed input is an input whose quantity is fixed for a period of time and cannot be varied • Variable inputs: resources that can change in quantity depending on the level of output being produced

  7. Production and Costs • A fixed cost is a cost that does not depend on the quantity of output produced. It is the cost of the fixed input • A variable cost is a cost that depends on the quantity of output produced. It is the cost of the variable input • Cost minimization generally involves variable costs • Cost minimization leads to profit maximization

  8. Total Costs of Production • The total cost (TC) of producing a given quantity of output is the sum of the fixed cost (FC) and the variable cost (VC) of producing that quantity of output • TC = FC + VC

  9. Fixed, variable and total costs of production for a firm Output (Q) VC* FC TC (‘000) 0 0 $30 $30 1 $10 30 40 2 25 30 55 3 45 30 75 4 70 30 100 5 100 30 130 6 135 30 165 * VC = Labor needed to produce Q * price of labor (wage rate)

  10. Average Total Cost • Average total cost (ATC) is total cost of production divided by the quantity of output produced • Total Cost/Quantity of Output • ATC = TC/Q

  11. Average Total Cost (ATC) Output (Q) TC (VC+FC) ATC (TC/Q) 0 $30 -- 1 40 40 2 55 27.5 3 75 25 4 100 25 5 130 26 6 165 27.5

  12. Profit maximization and the output decision • The rule for determining whether a firm is profitable depends on a comparison of the peer unit market price (P) or the marginal revenue of the good to the firm’s break even price • If P>ATC, the firm earns a profit • If P=ATC, the firm breaks even • If P<ATC, the firm incurs a loss • A firm’s break even price: minimum average total cost (ATC) • Minimum-cost output: it is the quantity of output level where the firm incurs the lowest ATC • Note the output levels of 3 and 4 with ATC=$25 in table

  13. Average Fixed Cost & Average Variable Cost • Average fixed cost: fixed cost per unit of output • Fixed Cost / Quantity of Output • AFC = FC/Q • Average variable cost: variable cost per unit of output • Variable Cost / Quantity of Output • AVC = VC/Q

  14. Average Fixed Cost (AFC) Output FC AFC (FC/Q) 0 $30 -- 1 30 30 2 30 15 3 30 10 4 30 7.5 5 30 6 6 30 5

  15. Average Variable Cost Output VC AVC (VC/Q) 0 0 -- 1 $10 10 2 25 12.5 3 45 15 4 70 17.5 5 100 20 6 135 22.5

  16. Various Costs of the Firm Q VC FC TC AVC AFC ATC 0 0 $30 $30 -- -- -- 1 $10 30 40 10 30 40 2 25 30 55 12.5 15 27.5 3 45 30 75 15 10 25 4 70 30 100 17.5 7.5 25 5 100 30 130 20 6 26 6 135 30 165 22.5 5 27.5

  17. Marginal Cost of Production • Change in total cost of production for a one unit increase in production quantity • Change in Total Cost / Change in Quantity

  18. Computing Marginal Cost of Production Q TC MC 0 $30 -- 1 40 10 2 55 15 3 75 20 4 100 25 5 130 30 6 165 35