LPSC Status. Assembly Hall. Removal starts and is in progress. Main infrastructure work will be done in November. (floor and wall painting, services installation). LPSC Status. Strip Modules handling tool. Hydraulic strike ordered and delivered in next few days.
E N D
LPSC Status. • Assembly Hall. • Removal starts and is in progress. • Main infrastructure work will be done in November. • (floor and wall painting, services installation).
LPSC Status. • Strip Modules handling tool. • Hydraulic strike ordered and delivered in next few days. • Structure scheduled for July in our mechanical workshop. • We do a dummy strip module (real size and weight) in order to test • this tool and the SM assembly procedure.
LPSC Status. • SM Platform. • Detailed drawings are in progress. • Scheduled in our mechanical workshop for December
LPSC Status. • SM tilt over mechanism. (needed in vertical Cosmic tests design) • Basic design is in progress. Winch Cable Tilt platform
LPSC Status. • SM tilt over mechanism. (needed in vertical Cosmic tests design) • Conceptual design is in progress.
LPSC Status. • Test beam Scintillators paddles: - Done and tested.