40 likes | 179 Views
EMMA Slides for Ian Robson 1 st July 2010. EMMA. EMMA 1 st beam into 4 sectors. Beam image on screen at the end of the 4 sectors, 22:37 on 22 nd June 2010. Previous slide shows the current installation of EMMA in ALICE
E N D
EMMA Slides for Ian Robson 1st July 2010
EMMA 1st beam into 4 sectors Beam image on screen at the end of the 4 sectors, 22:37 on 22nd June 2010 Previous slide shows the current installation of EMMA in ALICE First beam successfully injected into EMMA and steered trough the 4 sector on 22nd June Full EMMA ring commissioning with beam is planned to start in August 2010
CONFORM Project Open Day EMMA PAMELA ADSR • CONFORM Project Open Day was held in London on 24th June http://www.hep.manchester.ac.uk/g/accelerators/conform/openday2010/ • Purpose of the Open Day was to report progress on the project including • EMMA • PAMELA Design Study • Cell Studies • Accelerator Driven Subcritical Reactors • Opportunities for Industry • Next steps