120 likes | 243 Views
Remote Telemetry Data Acquisition System TRANSWORLD - SMARTGRID. SmartGrid TM. The Problems. Power Theft Overload Meter Tampering Meter Failure Manpower Billing Delays Reading Delays Slow Response. The Need. Automatic Meter Reading Collection Timely Billing Detection of Theft
E N D
Remote Telemetry Data Acquisition System TRANSWORLD - SMARTGRID SmartGridTM
Transworld The Problems Power Theft Overload Meter Tampering Meter Failure Manpower Billing Delays Reading Delays Slow Response
Transworld The Need Automatic Meter Reading Collection Timely Billing Detection of Theft Detection of Meter Tampering Auto Disconnection on failure to pay Auto Trip on Overload Detection Real Time Load and Payment Information
Transworld The Solution TRANSWORLD SMARTGRIDTM Remote Telemetry And Data Acquisition System
Transworld SMARTGRID Acquire Meter Reading in Real Time Over-The-Air Acquisition - Wireless Overload Protection & Penalty Time-Of-Day Tariff for all Consumers Log of Minute-by-Minute Consumption Remote Disconnection / Reconnection Direct Reading as well as Manual Download Automatic Billing and Payment Prepaid Option GIS based view
Transworld The SmartGrid Data Payment Data Metering Module MSEB Server Wireless Link Power Control Billing Bank Power Consumed Payment Upto 50 Consumers
Transworld Remote Metering Module Upto 50 Consumers LCD for Local Read Port for Local Data Logs per Minute Remote Disconnect Remote Reconnect Tx GSM/CDMA/PSTN Live Load Real Time Undeletable Data Sensors LCD View Processor KeyPad Data - RS232 Control Data Wireless Link to Server
Transworld Central Server Downloads Consumption Data Automatically Maintains and Computes Bill and Payment Info Updates from Bank Allows Consumer and SEB Access Serves Real Time Info GIS Capable Allows Remote Disconnect / Reconnect Wireless Link Consumer Payment Server Billing Distribution MIS
Transworld SmartGridTM Automatic Billing & Payment Service Disconnect / Reconnect Overload Data Manual Collection of Billing Data Time-Of-Day Tariff Real time Information Access Huge Savings
Transworld Fiscal Impact Cost per home < Rs. 1500/- 1 Remote Module handles <= 50 homes Installation Time = Existing System Data Transmission Cost < Rs. 10/- per month Saves Wastage by TOD Modular - Simple and Cheap Self Diagnostic
Transworld Roll Out Plan Proof Of Concept - 6 Weeks Prototyping & Testing - 12 Weeks Commercial Production - 24 Weeks Initial Commissioning - Urban Areas
Transworld TRANSWORLD SmartGrid Thank You! Transworld Compressor Technologies Ltd. C-3/8, Rakshalekha, Koregaon Park Pune - 411001