1 / 10

SBGN PD

SBGN PD. Current status, future changes and unresolved issues Harmony 2011 NYC. PD Specification. Level 1 Version 1: Sep 2008 Original specification Level 1 Version 1.1: Sep 2009 Fixed inconsistencies Typos Clarified “ontology” of glyphs

Download Presentation

SBGN PD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SBGN PD Current status, future changes and unresolved issues Harmony 2011 NYC

  2. PD Specification • Level 1 Version 1: Sep 2008 • Original specification • Level 1 Version 1.1: Sep 2009 • Fixed inconsistencies • Typos • Clarified “ontology” of glyphs • Nomenclature changes for consistency with other languages • Level 1 Version 1.2: Oct 2010 • Level 1 Version 1.3: Feb 2011 • Minor changes of clarity • Document errors • Level 1 Version 2.0 Apr/May 2011

  3. What’s in Version 2.0 • New/Modified Glyphs • Resolving semantic “issues” • Enumerated rules • Improve organisation/clarity of the spec

  4. Level 1 Version 2.0: Glyphs New Annotation Glyph State Glyph Change Empty Set Reversible Arc

  5. Synthetic Unique Names Confusing but correct? Level 1 Version 2.0: Semantics Subunits are not EPNS

  6. Level 1 Version 2.0: Semantics Process Duplication A A ZZZ ZZZ B B YYY YYY C C XXX XXX LABEL

  7. Level 1 Version 2.0: Semantics Source and Sink => Empty Set A Source Empty Set P A Sink

  8. Level 1 Version 2.0: Spec • Focus more on EPN types rather than glyphs • Integrate clone marker section • Integrate multimer section • Integrate semantic rules into glyphs • Enumerate rules – facilitate computational validation

  9. Road Map for PD • Level 1 Version 2.0 • Draft for Review: May 2011 • RFC: 2-3 Weeks • Release June 2011 • Tool support! • Level 2 Version 1.0 • Theme: RISC notation? • Start work in Harmony 2012? • Release First Draft COMBINE 2012?

  10. ER Issues • Delay • Can arrow come from entity • Can’t define initial state • Outcome not an Entity

More Related