WORKGROUP 1 Combustion and gasification of biomass and wastes for heat and energy WORKGROUP leader

THERMOCHEMICAL CONVERSION OF SOLID FUELS – Processes of pyrolysis, gasification and combustion of biomass an wastes. WORKGROUP 1 Combustion and gasification of biomass and wastes for heat and energy WORKGROUP leader Tomasz Chmielniak , Ph . D . Scope of the CONBIOT Project; year 2.

keagan
Download Presentation

WORKGROUP 1 Combustion and gasification of biomass and wastes for heat and energy WORKGROUP leader

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THERMOCHEMICAL CONVERSION OF SOLID FUELS – Processes of pyrolysis, gasification and combustionof biomass an wastes. WORKGROUP 1 Combustion and gasification of biomassand wastes for heat and energy WORKGROUP leader Tomasz Chmielniak, Ph.D

  2. Scope of the CONBIOT Project; year 2 • WP2: SPECIALISED SEMINARS • Task 2.2:Control and Process Monitoring – Combustion and Gasification Performance • WP3: TWINNINGS WITH EU UNIVERSITIES AND RESEARCH INSTITUTES • Task 3.1:Energy and Resources Research Institute • University of Leeds • Task 3.2:Danish International Consulting • TNO Environmental, Energy and ProcessInvitation • Task 3.3: … • WP4: PROFESSIONAL TRAINING COURSES • Task 4.2: Modelling and testing of termochemical destruction processes of biomass and wastes

  3. WP2: SPECIALISED SEMINARS • Task 2.2 • Scope: Control and Process Monitoring – Combustion and Gasification Performance • research and measurement procedures • methods of fuels quality determination • design of combustion and gasification processes • procedures for determination of pollutants • legislation in EU and Poland • 10 lectures; month 22

  4. WP3: TWINNINGS WITH EU UNIVERSITIESAND RESEARCH INSTITUTES • Task 3.1:Energy and Resources Research Institute • University of Leeds • Scientific internships of young researches • two scientific internships for young researches • (1 and 3 months) • new person: date and program change • Reduction of NOx and SOx emissions using catalytic combustion of coal and biomass and their co-combustion.

  5. WP3: TWINNINGS WITH EU UNIVERSITIESAND RESEARCH INSTITUTES • Task 3.2:Danish International Consulting • TNO Environmental, Energy and Process Invitation • Threevisits • Danish International Consulting; Cooperation Agreement, possible directions of cooperation • TNO Environmental, Energy and Process Invitation; • co-ordination of collaboration • Institute for Chemical Processing of Coal; DIC • Two scientific internships of young researchers in TNO • modelling of gasification and combustion processes, modern technologies, accreditation and certification

  6. WP3: TWINNINGS WITH EU UNIVERSITIESAND RESEARCH INSTITUTES • Task 3.3: New Partner • One working visit • Scope of the cooperation, including scientific internships for young researcher of the Center (3 months, year 3) • Cooperation Agreement • Fraunhofer Institut, Umsicht; Germany • JRC IES; Ispra Italy

  7. WP4: PROFESSIONAL TRAINING COURSES • Task 4.2 • Scope:Modelling and testing of termochemical destruction processes of biomass and wastes • theory of the processes • existing models and development of models • methods of calculation • experimental verification • other open problems • 6 lectures from UL, TNO, CISC, IUT; month 18

  8. Research activityGASIFICATION AND COMBUSTION • GASIFICATION OF BIOMASS AND WASTE – GAS TRATMENT FOR CHP APPLICATION; Plasma gasification (IChPW Project) • RESEARCH ON LOW CAPACITY BIOMASS BOILERS; Energy and emission efficiency tests, construction and process development; Commercial partners

  9. PROBLEMS • Search of new project partner • R&D institutions • Activity related to the Center • Possibility of scientific internships of young researchers from the Center • Young researchers • Quit job in the Institute