Area History • 1989-1990 • DOT plans Minnie Street Connector • S&W investigate surface soil, subsurface soil, and groundwater • Widespread contamination stops project (petroleum, solvents, metals, PCBs) • 1993-1996 • MSLUG Project - Railroad and ~15 RPs • USGS investigates groundwater characteristics and quality • Primary focus is public drinking water wells on other site of the Chena River • 2002 – 2004 • ADEC begins FAIR project (larger than MSLUG) • 2002 Well point investigation conducted and coordinated sampling begins • 2003 Risk Management Workplan completed by EPA
Area History • 1989-1990 • DOT plans Minnie Street Connector • S&W investigate surface soil, subsurface soil, and groundwater • Widespread contamination stops project (petroleum, solvents, metals, PCBs) • 1993-1996 • MSLUG Project - Railroad and ~15 RPs • USGS investigates groundwater characteristics and quality • Primary focus is public drinking water wells on other site of the Chena River • 2002 – 2004 • ADEC begins FAIR project (larger than MSLUG) • 2002 Well point investigation conducted and coordinated sampling begins • 2003 Risk Management Workplan completed by EPA
September 1993 October 1993 March 1994 April 1994
Area History • 1989-1990 • DOT plans Minnie Street Connector • S&W investigate surface soil, subsurface soil, and groundwater • Widespread contamination stops project (petroleum, solvents, metals, PCBs) • 1993-1996 • MSLUG Project - Railroad and ~15 RPs • USGS investigates groundwater characteristics and quality Primary focus is public drinking water wells on other site of the Chena River • 2002 – 2004 • ADEC begins FAIR project (larger than MSLUG) • 2002 Well point investigation conducted and coordinated sampling begins • 2003 Risk Management Workplan completed by EPA
Four Tank Farms – fuel delivered by rail Van Gas Tanks Saupes Tanks Willners Tanks UNOCAL Tanks
Benzene ND <5 ug/L 5-99 ug/L 100-999 ug/L >1,000 ug/L Product Groundwater Results - 2002
Benzene ND <5 ug/L 5-99 ug/L 100-999 ug/L >1,000 ug/L Product Groundwater Results – Fall 2003
Benzene ND <5 ug/L 5-99 ug/L 100-999 ug/L >1,000 ug/L Product Groundwater Results – Spring 2004
GRO ND <1.3 mg/L 1.3-9 mg/L 10-99 mg/L >100 mg/L Product Groundwater Results - 2002
GRO ND <1.3 mg/L 1.3-9 mg/L 10-99 mg/L >100 mg/L Product Groundwater Results – Spring 2004
DRO ND <1.5 mg/L 1.5-9 mg/L 10-99 mg/L >100 mg/L Product Groundwater Results - 2002
DRO ND <1.5 mg/L 1.5-9 mg/L 10-99 mg/L >100 mg/L Product Groundwater Results – Fall 2003
DRO ND <1.5 mg/L 1.5-9 mg/L 10-99 mg/L >100 mg/L Product Groundwater Results – Spring 2004
RRO ND <1.1 mg/L 1.1-9 mg/L 10-99 mg/L >100 mg/L Product Groundwater Results – Spring 2004