Fairbanks Areawide Industrial Reclamation Project AREA HISTORY Janice Wiegers ADEC

Fairbanks Areawide Industrial Reclamation Project AREA HISTORY Janice Wiegers ADEC. Area History. 1989-1990 DOT plans Minnie Street Connector S&W investigate surface soil, subsurface soil, and groundwater Widespread contamination stops project (petroleum, solvents, metals, PCBs)

keita
Download Presentation

Fairbanks Areawide Industrial Reclamation Project AREA HISTORY Janice Wiegers ADEC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fairbanks Areawide Industrial Reclamation Project AREA HISTORY Janice Wiegers ADEC

  2. Area History • 1989-1990 • DOT plans Minnie Street Connector • S&W investigate surface soil, subsurface soil, and groundwater • Widespread contamination stops project (petroleum, solvents, metals, PCBs) • 1993-1996 • MSLUG Project - Railroad and ~15 RPs • USGS investigates groundwater characteristics and quality • Primary focus is public drinking water wells on other site of the Chena River • 2002 – 2004 • ADEC begins FAIR project (larger than MSLUG) • 2002 Well point investigation conducted and coordinated sampling begins • 2003 Risk Management Workplan completed by EPA

  3. Area History • 1989-1990 • DOT plans Minnie Street Connector • S&W investigate surface soil, subsurface soil, and groundwater • Widespread contamination stops project (petroleum, solvents, metals, PCBs) • 1993-1996 • MSLUG Project - Railroad and ~15 RPs • USGS investigates groundwater characteristics and quality • Primary focus is public drinking water wells on other site of the Chena River • 2002 – 2004 • ADEC begins FAIR project (larger than MSLUG) • 2002 Well point investigation conducted and coordinated sampling begins • 2003 Risk Management Workplan completed by EPA

  4. MSLUG

  5. September 1993 October 1993 March 1994 April 1994

  6. Area History • 1989-1990 • DOT plans Minnie Street Connector • S&W investigate surface soil, subsurface soil, and groundwater • Widespread contamination stops project (petroleum, solvents, metals, PCBs) • 1993-1996 • MSLUG Project - Railroad and ~15 RPs • USGS investigates groundwater characteristics and quality Primary focus is public drinking water wells on other site of the Chena River • 2002 – 2004 • ADEC begins FAIR project (larger than MSLUG) • 2002 Well point investigation conducted and coordinated sampling begins • 2003 Risk Management Workplan completed by EPA

  7. FAIR AREA

  8. Four Tank Farms – fuel delivered by rail Van Gas Tanks Saupes Tanks Willners Tanks UNOCAL Tanks

  9. FAIR AREA – Baseline Sampling

  10. Benzene ND <5 ug/L 5-99 ug/L 100-999 ug/L >1,000 ug/L Product Groundwater Results - 2002

  11. Benzene ND <5 ug/L 5-99 ug/L 100-999 ug/L >1,000 ug/L Product Groundwater Results – Fall 2003

  12. Benzene ND <5 ug/L 5-99 ug/L 100-999 ug/L >1,000 ug/L Product Groundwater Results – Spring 2004

  13. GRO ND <1.3 mg/L 1.3-9 mg/L 10-99 mg/L >100 mg/L Product Groundwater Results - 2002

  14. GRO ND <1.3 mg/L 1.3-9 mg/L 10-99 mg/L >100 mg/L Product Groundwater Results – Spring 2004

  15. DRO ND <1.5 mg/L 1.5-9 mg/L 10-99 mg/L >100 mg/L Product Groundwater Results - 2002

  16. DRO ND <1.5 mg/L 1.5-9 mg/L 10-99 mg/L >100 mg/L Product Groundwater Results – Fall 2003

  17. DRO ND <1.5 mg/L 1.5-9 mg/L 10-99 mg/L >100 mg/L Product Groundwater Results – Spring 2004

  18. RRO ND <1.1 mg/L 1.1-9 mg/L 10-99 mg/L >100 mg/L Product Groundwater Results – Spring 2004