Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR 19.09.2014
Objective COM11 • Comprehensive Explanation • Link to European ATM Master Plan • Most important SLoA(s) • Finalisation Criteria and Closed Questions • Supporting Material • ESSIP Report 2013 • Objective Coordinator’s Analysis, recommendations, tips & tricks • Conclusions • Links and contacts ESSIP Plan 2014 / Objective COM11
Comprehensive Explanation • The initiative covers inter centre (encompassing all type of ATM Units) voice communication and the links with the ground radio Stations; • The objective forecasts that all ECAC States migrate their ATM voice services to VoIP by the specified Full Operational Capability 12/2020; • Initial Operational Capability (Forward fit) date is 01/2013 for both inter-centre telephony and the links to the ground radio stations on the ground segment of the Air-Ground voice. • Inter centres voice communications are currently mainly performed via analogue and partially digital circuits (ATS-QSIG) since 2003. • At present VoIP is identified as being the medium term standard for ground telephony and ground segment of the Air-Ground voice. ESSIP Plan 2014 / Objective COM11
Link to European ATM Master Plan • Digital Voice/VoIP for ground telephony CTE-C8 ESSIP Plan 2014 / Objective COM11
Most important SLoA(s) • COM11-ASP03Upgrade and put into service Voice Communication Systems to support VoIP inter-centre telephony (12/2020) • COM11-ASP04 Upgrade and put into service Voice Communication Systems to support VoIP links to the ground radio stations (12/2020) ESSIP Plan 2014 / Objective COM11
Finalisation Criteria and Closed Questions • Voice communications systems have been upgraded; • The technical file (TF) with evidences of compliance and the EC declaration of verification of systems (DoV) has been delivered to the competent National Supervisory Authority (NSA); • Upgraded voice communication systems have been put into service ESSIP Plan 2014 / Objective COM11
Regulation and Supporting Material • EUROCONTROL - ESARR 4 Risk Assessment and Mitigation in ATM • EUROCAE - ED-136 - Voice over Internet Protocol (VoIP) Air Traffic Management (ATM) System Operational and Technical Requirements 02/2009; • EUROCAE - ED-137B - Interoperability Standards for VoIP ATM Components (Volume 1: Radio - Volume 2: Telephone - Volume 3: European Legacy Telephone Interworking - Volume 4: Recording - Volume 5: Supervision) 01/2012; • EUROCAE - ED-138 - Network Requirements and Performances for Voice over Internet Protocol (VoIP) Air Traffic Management (ATM) Systems (Part 1: Network Specification – Part 2: Network Design Guideline) - 28.02.2009; • EUROCONTROL - SIP v ATS-QSIG Gateway Interworking Test Specification - Edition 2 / 12/2013; • EUROCONTROL - SIP v ATS-R2 Gateway Interworking Test Specification - Edition 2 / 12/2013; • EUROCONTROL - VOTER - Edition 2.7 / 02/2014; • EUROCONTROL - VoIP in ATM Cross-Reference Matrix - Edition 2 / 12/2013; • EUROCONTROL - VoIP in ATM Telephony Test case specification - Edition 2/ 12/2013. ESSIP Plan 2014 / Objective COM11
ESSIP Report 2013 • Majority of States have an implementation plan. Five States consider the objective not mature enough to start planning the implementation; • 35 States have reported the objective ‘Planned’, while one State has reported it as Late. Five States (DE, DK, HR, LU and NO) have reported ‘No Plan’ for the time being; • The progress compared with the last cycle is as follows: Two States (HR & NO) have changed the status from Planned to No Plan. MAS, MD, MT & TR have postponed the planninng for completion by one year and AM, IE & MK by two years. ESSIP Plan 2014 / Objective COM11
Objective Coordinator’s Analysis, recommendations, tips & tricks • Early implementation • Allows to get the benefit of the IP infrastructure, and to get early return on investment • Increases Airspace flexibility within functional airspace blocks in a multi-vendor operational setting. • Facilitates business continuity as Telecom service providers are phasing out their legacy analogue, 64kBit/s based and later 2MBit/s based services. ESSIP Plan 2014 / Objective COM11
Conclusions • VoIP in ATM is a mature standard referenced by ICAO; • VoIP in ATM is ready to be deployed over the IP infrastructure (PENS and ANSPs IP networks); • VoIP in ATM will increase Airspace flexibility; • VoIP in ATM will support and facilitate business continuity. ESSIP Plan 2014 / Objective COM11
Links and contacts • Objective Coordinator: Adriatik Kokona, +32 2 729 3556 adriatik.kokona@eurocontrol.int • DNM Objective Expert(s): L. POPESCU, +32 2 729 3757 liviu.popescu@eurocontrol.int ESSIP Plan 2014 / Objective COM11