An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DB updated parameters and a first look at power flow and overall consumption B.Jeanneret, R. Corsini CLIC parameter WG, 23 April 2007 Update after CPWG 15 Apr 07 : Alexej new parameters • MB Bunch spacing 7  8 buckets • MB Bunch population 5.8 109 5.2 109 • HDS power 76 MW  69 MW • RF pulse length 244 ns  297 ns • MB train length 154 ns 207 ns Alexej used frep = 44 Hz We use below,as discussed,frep = 50 Hz L1= 3.75 1034cm-2s-1

  2. definitions Alexej flat top=MB train length = 207ns tp tf tr

  3. Drive Beam • Keep scheme 2 * 3 * 3 • Still two drive beam complexes

  4. Comments • Nb stations : 32  26 , L= 810 m • IDB : 100 A  95 A • E : 2.0 GeV  2.35 GeV • Igor asked for suppressing the detuning of the DB • the presently assumed form factor FDB=0.93 includes as well the remaining inefficiency after detuning compensation – about 5% with old parameters. • Now with no detuning, the losses should be about 1.5 % only. • FDB will be updated (to better), when all other small inefficiencies will be reconsidered.

  5. Power Consumption CPWG 23 Apr 07 CLIC Note 627 294 7 32 27 22 4 385 38.9 10 3.75 9.7

  6. CLIC Note 627 L1= 3.3 1034cm-2s-1

  7. CPWG 23 Apr 07 385 320 316 32 27 185 32.5 172 31 .83 133 10 % 125 .31 39 L1= 3.75 1034cm-2s-1

  8. CPWG 15 Apr 07 342 278 274 31 26 161 31.6 150 32.5 .83 116 10.3 % 108 .325 35 L1= 3.3 1034cm-2s-1

  9. 16.6 MW + 5.3 MW + 5 MW = 27 MW CPWG 23 Apr 07 385 316 MW 320 274 27 32 161 22.2 MW + 31.6 5 MW + Water cooling (93% of total 3% losses) 150 following CLIC Yellow report CERN 2000-008 4.7 MW = Air cooling (7% of total 40% losses) 32.5 .83 32 MW 116 Total power for cooling about 20MW 10.3 % 108 .321 39

  10. 16.6 MW + 4.7 MW + 4.4 MW = 26 MW CPWG 15 Apr 07 342 274 MW 278 274 26 31 161 22.2 MW + 31.6 4.4 MW + Water cooling (93% of total 3% losses) 150 following CLIC Yellow report CERN 2000-008 4.2 MW = Air cooling (7% of total 40% losses) 32.5 .83 31 MW 116 Total power for cooling about 18MW 10.3 % 108 .321 35