An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Airworthiness Issues and Criteria

  2. Equipment Standards • TSO-C145a: SBAS Sensors (for use with FMS) • TSO-C146a: SBAS Panel-Mount Navigation equipment • Both reference RTCA/DO-229C, with a few exceptions • Both supercede TSO-C129() • Class 1= no LPV; Class 3=LPV • EASA TSO-C145 and C-146 • RTCA updating to DO-229D (Summer 06) • Will include many clarifications • Also includes correction to satellite selection

  3. Installation Guidance • AC 20-138A (GNSS Installation) • Issued 22 Dec 2003 • Addresses SBAS (and GBAS) installation • Mask Angles • Group Delay of Total System • Evaluation of precision approach and APV capabilities

  4. Approval Challenges • Volume of projects expected to be significant • ~70,000 Existing GPS Users with equipment that will have an upgrade path to SBAS: Will be modification, not new installation • Expect many more new installations • Not possible to conduct each project as supplemental type certificate

  5. Example Equipment & Approval • Garmin GNS-480 • SBAS, including LPV • Built-in VOR and VHF Comm • Only existing Class 3 (LPV-capable) equipment • Approved Model List • FAA has approved not just one installation, but installations in ~135 aircraft types in accordance with installation instructions

  6. Field Approvals • AC 20-138A expanded use of field approvals to install GNSS equipment • Can be accomplished as a minor modification under certain circumstances • Installed in accordance with manufacturer instructions • Interface with all other equipment covered in manufacturer instructions of both sets of equipment • Expect this provision to be used for upgrades to existing equipment

  7. Questions?