An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Far Experimental Hutches David Saenz Project Manager

  2. Far Experimental Hall Hutches • Scope • Design Status/Deliverables • Schedule • Estimated Construction Cost • Present Status • Summary

  3. Scope • Approximately 7,800sf of new facilities for three Hutches, Control Rooms and Common Rooms • Current approved specifications are well defined and present no major challenges

  4. Scope – Cont’d 1 ton capacity cranes Radiation protection Standard door sizes Existing common floor Standard wall/ceiling finishes No acoustic requirements • Utilities (MEP) • Process chilled water • Chilled water • Compressed air @ 100psi • HVAC 72°± 1 °F • RH 45% ± 10% • 24” cable trays • Standard lighting • Surface mounted conduits • Standard 110V and 208V outlets

  5. Engineering Specification Documents • LCLS ESD’s approved by key stake-holders. • ESD 1.9-112 • Hutch 4 • ESD 1.9-113 • Hutch 5 • ESD 1.9-114 • CXI Room • ESD 1.9-115 • XCS Room • ESD 1.9-116 • Common Room • ESD 1.9-117

  6. Access Tunnel (looking south)

  7. FEH (looking west) Existing utility systems in place

  8. FEH Floor Plan/Section by DGA Floor Plan Building Section

  9. HVAC Floor Plan by DGA

  10. Design Status • Design was awarded Oct 10, 08 • Title I completed on Nov 6, 08 • Internal design review currently in process and will be completed on 11/13/2008 • Title II 60% scheduled for Jan 15, 09 • Title II 90% scheduled for Feb 25, 09 • Title II 100% scheduled for Mar 4, 09

  11. Design Deliverables √ Existing Conditions Report √ 30% Design Review √ Structural Design Review √ Preliminary Cost Estimate 60% Design Review Detailed Cost Estimate 90% Design Review Engineering Coordination Presentation Updated Cost Estimate 100% Design Review Final Cost Estimate Issue of Issue For Construction (IFC) documents Value Engineering • All deliverables are expected to be provided on time! • Sufficient quantity of deliverables are established to manage progress and complete development

  12. Construction Schedule • 9 months including pre-construction activities to commence Mar 09 and complete Dec 09 • Need to revise schedule to reflect construction award Mar 09 for major packages

  13. Estimated Construction Cost • Initial estimate provided by AE valued at $3.6M • Includes direct and in-direct cost and escalation • Strategy for construction delivery method is consistent with expectations • Design → Bid → Build • Current WBS (1.9.3.14.2) budget is $4.1M (including contingency)

  14. Summary • Design parameters are clearly defined • Sufficient quantity of deliverables are in process • Title I complete • Title II in process • AE firm has provided alternatives solutions for higher priced items i.e. structural steel

  15. end of presentation