1 / 18

News of the ISOLDE Group: June 27, 2017

This news update provides information on the associates, fellows, and students of the ISOLDE Group, with a focus on exotic beams research. It also discusses the long-range plan for the group, EURISOL-DF project, collaboration matters, a 5-year summary, and future prospects.

kmorrissey
Download Presentation

News of the ISOLDE Group: June 27, 2017

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. News of the ISOLDE Group27thof June 2017 Maria J. G. Borge

  2. Outline • Associates, Fellows and Students • Focus on Exotic beams at ISOLDE: A Laboratory portrait. • Long Range Plan • EURISOL-DF  Postponed for 2020 • Collaboration matters • 5 years summary • Future prospects

  3. Associates & Corresponding Associates & staff • Associates (16thSeptember 2017) • Bertram Blank ( – August 2017) • Angela Bracco(–July 2017) • Andrei Andreyev ( July 2017– June 2018) • JoakimCederkal (September 2017 – August 2018) • Corresponding Associates (16thSeptember 2017) • OlofTengblad(-June 2017) • Staff members : • Magda Kowlaska (Oct 2015 – Sep 2018) ERC betaDropNMR • Stephan Ettenbauer (Feb 2017-Jan2021) ERC MIRACLS • Technician ? 50% (Francois d’ Oliveira, Francois Garnier) Projects via Karl J. (ENSAR2) • ISOLDE User Support: • Jennifer Weterings (2002 - ) 2012-2013 • Associates • MarekPfützner ( – June 2013) • Corresponding Associates • OlofTengblad(Sept-Dec 2012)

  4. Fellows & Associates & Corresponding Associates • Fellows:(4th September 2017) • Liam Gaffney (Oct 2016 – Sep 2019) • Hanne Heylen (Oct 2017-Sep 2020) • Kara Lynch (Jan 2015 – Dec 2017) • Vladimir Manea(Jan2016 – April 2018) APPLIED: • Akira Miyazaki (May 2017- Dec 2018, SC cavities Manchester Contract) • LinaPallada (Applied Fellow, June 2017-, ERC) • Andree Welker (August 2017 - ) (Applied Fellow, setting zero-spectrometer) • Frank Wienholtz(Jan2016 – Dec2018) (Applied Fellow, ERC) Fellows: (2012-2013) Susanne Kreim, Dec2014 (+ 1y COFUND) Elisa Rapisarda, Sept 2014 APPLIED: Monika Stachura, star9ng April 2013- March 2015 • Jan Kurcewicz, nov 2013 (Applied Fellow, ENSAR)

  5. Doctoral Students (Present/ Past) • 2012 • Doctoral student: Kara Lynch, July2010-August 2013. • Technicalstudent: RikardVinge, July 2013 (Twin-EBIS) • CERN Doctoral Student for IDS: RazvanLica (Sep2014 – August 2017) • Doctoral Program with Germany -Andree Werkens(Feb 2015-Jan2018) ISOLTRAP -Jonas Karhein (Nov2017- • Doctoral student York-CERN (BETADROP) Rob Harding (Jan 2017-) • Doctoral student Leuven-BETADROP : Fredrik P. Gustafsson (july 2017-) • Doctoral student MIRACLS: Simon Lechner (Sept 2017) VarvaraLagaki (Sept 2017) • CERN money for hiring a student from January 2018: Deadline: 16 October 2017

  6. NuPECC/ Long Range Plan • NuPECC meeting @ CERN : 10-11 of March Mini-workshop Friday Morning opening by Eckhart Elsen Visits to ALICE and ISOLDE Important that someone represent ISOLDE in NuPECC • Long Range Plan: approved in The NuPECC Lisbon Meeting 16-17 June Launch LRP in Brussels 27th of November

  7. AGATA @ ISOLDE (June 2017) • AGATA steering committee suggested exploring the option for in-beam g-ray spectroscopy with AGATA coupled to the HIE-ISOLDE accelerator after the CERN long shutdown 2. A "White Book" with the physics that will be done with AGATA during the 10 year time period from 2021 to 2030. Five facilities are considered to be of interest for hosting AGATA during this period: GANIL/SPIRAL1/SPIRAL2, GSI/FAIR, HIE-ISOLDE, JYFL and LNL/SPES. Unique opportunity to exploit the potential of reaccelerated HIE-ISOLDE beams with the position sensitive g-ray tracking array due to improved energy resolution up to 10 MeV/u and increased detection efficiency.

  8. ISOLDE Laboratory Portrait • Title: “Focus on exotic beams at ISOLDE: A laboratory Portrait ” • To be publish in J Phys G in 2017 • Content: 17 already fully accepted!! • Experimental facilities and methods: http://iopscience.iop.org/journal/0954-3899/page/ISOLDE%20laboratory%20portrait • 16received / 9 on the web • invited contributions by theoreticians • 2 received Articles by submission/ 1 on the web • 10 contributions received: / 7 on web Volumen: J. Phys. G Nucl. Part. Phys 44, 2017 • Contact person in IOP Claire Fullarton: Claire.fullarton@iop.org • Should we pay for Open Access? Cost for the volumen : 35.000 CHF • Push to have it released October the 16th. • Bind in a hard-copy

  9. CERN Open Access • CERN ispushingtogetthepublication in Open access • It has negociatedwillthefollowingJournals (SCOAP3) • Acta FisicaPolonica B • ChinesePhysics C • EurPhys J. C • Nuclear Physics B • PhysicsLetters B • PhysRev C (from 2018) • PhysRev D (from 2018) • PhysRevletts (from 2018) Importanttonegociate and getEurPhys J A and NucPhys A

  10. CollaborationAccount 300.000 CHF 2009-2011 500.000 CHF 2012-2015 824.000 + 140.000 CHF 2016 400.000 + 140.000 CHF 2017

  11. HIE-ISOLDE payments Present Balance of theCollaborationaccount= 529.579 CHF Outstanding 2016 : Greece and Norway Paid 2017: CERN, F, Fi, Ge, P(1/2), S, Sk, SA,UK

  12. ISOLDE Statistics • Wehavetaken a “photo” of the ISOLDE Communityaccordingtothe CERN user office. • “Photo” takenthe 23rd of June 2017 • Users : 487 • PART (userswhich CERN affiliation has expired) : 711 • CERN in housegroup ( more than 50% @ CERN) approx 30 • Wewouldlikethatthe ISOLDE users subscribe forlongperiodstofacilitatethework of ourUserofficer.

  13. Summary ( 5 Years) • Increase of the in-houseGroupstaff + Target (LC SebastienRothe) + RILIS ( permanent Bruce Marsh) + OP (A. RodriguezSection Leader) • Designthehands-on RP and Electricitycoursesfor ISOLDE (M. Kowlaska) • New building 508 • 6 courses 2013-2017 • Multiplepresence in the media: CERN Courrier, PH Newsletters, Hangout • New web page following CERN standards ( J. Weterings) • Minutes of GUI alsolinkedto ISOLDE web page • New formatforthe ISOLDE Newsletter (V. Manea) withindex of content • Launch of a laboratotyportraittocelebratethe 50 years. • Thelimit of 2micro-Amp has beenableto be removed in some cases as theimportant factor istheoverallradiactivity per year and wehavenowmanydetectors in thehall thatallowforabetter control of radioactivitythanpreviously.

  14. Courses 2013 - 2017 • Themesin thephysics of AtomicNuclei, complexinteractionand extraordinarily simple behaviour. Thenew Frontierof exoticNuclei—shatteringcherishedparadigms and building a new synthesis-Emergent collec9vity, phase transi9ons and cosmologicalconsecuences. • Rick Casten, July 2012 • Statisticalmethodsfor Nuclear Physics KarstenRiisager, 18-20 of March, 2013 (25 attendants!!) • Shell modelfor non Practioners Frederick Nowacki, Alfredo Poves, C. Sieja, 14-18 October 2013 • Nuclear Reactions and Nuclear Structure CourseWiltonCartford, Alexia DiPietro, and Antonio Moro, 22-25 April 2014 • Coulexschool M. Zielinska et al, the 27th-29th of January 2016 • Nuclear astrophysics Francois de Oliveira, Gabriel Martinez Pinedo, Olivier Sorlin, 9-11 of May

  15. User Facilities • Building 507 is in very bad stage. • Profit for the shutdown to demolish • and build a new one Ceiling Cracks on the external wall Broken external panels

  16. Building 508 (115+ 507+601) • Started 2013: Packed material, removed Asbestos, desclassifybuilding 115 • Asbestos: Desamiantage of bat 601 and 115 finished 5 July 2013 • Demolition: 14th July – 5th of August 2013 • Drains and waternetworks: 5th August – 31st of August • New accesstothe hall • Summer 2013 thelayout of thebuildingdefined: • Building 508 layout: • The new building 508 Light metal structure with 2 concrete floors: • Total surface 864m2 Ground floor (only accessible from within the classified area): 432 m2 - Solid state, Laser labs and workshop First floor (accessible from outside the classified area): 432m2 - Data Acquisition rooms - Meeting room/Visitors Center - Kitchen - Isolde Control Room October 2013 June 2013

  17. Timeline & Budget (as October 2013) Total costs light structure building 508 (incl. ICR & services): 1.8MCHF (October 2013) Includes Infrastructure: CV • Approved budget: 600kCHF for consolidation 350kCHF for LS1 400kCHF by PH dept.1.35MCHF (without control room) • New Isolde Control room: 185 kCHF by BE+EN dept.Extra costs light structure building: 200kCHF by GS dept385kCHF Missing=65kCHF TIMELINE: • Finished 2014. CV TOO Expensive (Onlygroundfloor. No!!! BuildingreadyMay 2014 / InfrastructureNovember 2014, LASERS @ Hall to do physics • CV in bottomFloorfromthestart 2015 • Control room, visitorsroomand kitchencompletedforthestart of 2016. • CV in 1st floorworking in June 2017.

  18. FutureProspects • HIE-ISOLDE phase 3: Angela conversation with Fabiola at the beginning of July crucial. • IMPORTANT TO KEEP the team of experts. • Create a working group to look and the original project. • Automatic LN2 filling installation in the hall. (LS2). • New large instrumentation :ISS, HiFi(HiE-ISOLDE Fragment Identifier, AGATA? • Boost study of safety to be able to profit from the higher intensity of LINAC4. • Following up on the Beam Dumps • Storage Ring plans for the future.

More Related