250 likes | 352 Views
DRAFT 2011-12-11. Barents 2020 Final Report. RN01 “Co-ordination of Deliverables” Moscow 14 December 2011. Presented by Vladimir Vernikovskij, Russian Coordinator of RN01. RN01 Participants. Co-ordinators. 2. RN01 - Mandate for Phase IV.
E N D
DRAFT 2011-12-11 Barents 2020 Final Report RN01 “Co-ordination of Deliverables” Moscow 14 December 2011 Presented by Vladimir Vernikovskij,Russian Coordinator of RN01
RN01 Participants Co-ordinators 2
RN01 - Mandate for Phase IV • Recommend how deliverables should be structured and published • Review deliverables for compliance with the recommendations, • prepare roadmaps for implementation of deliverables • Create awareness among the potential recipients as to what is coming • (e.g. standards organisations) • Provide proposal for an Arctic long term international standards program • (ref. ISO/TC67 MC Ad-hoc group Arctic Operations)
Task 1: Recommendation of deliverables • Report developed and delivered to Steering Committee 7th Dec. 2010 • Recommendations presented at B2020 Conference 9th Dec. 2010
Task 2Review of deliverables and recommendation for implementation
Application Deliverable Recipient RN02 - Ice Loads
Recipient Deliverable RN03 – Risk Management
Application Deliverable Recipient RN04 – Evacuation & Rescue
Application Deliverable Recipient RN05 – Human Factors
Application Deliverable Recipient RN06 – Ice Management
Application Deliverable Recipient RN07 – Operational Emissions & Discharges
Task 3: Creating Awareness Initiatives RN01 participation and presentations: Plenary meeting of ISO TC67/SC7 Singapore, Jan. 2011 ISO/TC67/Management Committee meeting San Francisco, June 2011 where the formation of ISO/TC67 MC AHG “Arctic Operations” were discussed Norwegian Sector Board for Petroleum Standardisation OGP Standards committee meetings OGP Arctic Co-ordination TF meetings Article in OGP Standards bulletin 2011 18 18
Task 4 – Proposal for Arctic Long Term Standardisation 1 2 3 4
ISO AHG 2 • The ISO/TC67 MC Ad-hoc group on Arctic Operations used the Barents 2020 RN01 report as a basis for their recommendations • Recommended to the ISO/TC67 plenary meeting in Moscow, 14-15th September 2011: • to set up a new subcommittee for Arctic Operations • to invite Russia to propose a chairman and secretary. • Re. ISO/TC67 N 1148 Report ISO TC67 MC AHG Arctic operations, dated: 2011-09-07. • .
3 3 – IOS plenary meeting • The plenary meeting of ISO/TC67 took a resolution in its meeting 2011-09-15 to establish SC8 “Arctic Operations”. • The SC8 work programme will be developed on the basis of the abovementioned work items. • The formal establishment of SC8 has been approved by ISO Technical Management Board • Preparations for the first meeting can start. Detailed new work item proposals are being prepared.
4 ISO TC67 SC8 • SC 8 work programme to start with about 15 work items, which should include the following subjects and/or standards: • Working environment in connection with cold-climate conditions (1 standard ready in late 2014); • Escape, evacuation and rescue (1 standard ready in early 2014)); • Maintenance of onshore and offshore structures (2 standards ready in late 2014); • Ice management (6 standards ready in 2015); • Onshore and offshore logistics (2 standards ready in late 2014); • Plant security (1 standard ready in early 2014). • The detailed new work item proposals are being prepared.
Options for final reporting • Barents 2020 technical report • Proposal for Guideline(s) or Recommended Practice(s) • GAZPROM (STO) • DNV (RP) • OGP • Proposal for identical Russian and Norwegian national supplementary standard to an ISO standard • GOST R Standard, Recommendation or “set of rules” • NS or NORSOK standard • Proposal for national annex to adopted ISO or EN-ISO standard • Proposal for ISO Technical Specification (TS) • Proposal for ISO Technical Report (TR) • Proposal for ISO Publicly Available Specification (PAS) • Proposal for ISO International Workshop Agreement (IWA) • Proposal for ISO Amendment to existing standard (Amd)