Barents 2020 Final Report

DRAFT 2011-12-11. Barents 2020 Final Report. RN01 “Co-ordination of Deliverables” Moscow 14 December 2011. Presented by Vladimir Vernikovskij, Russian Coordinator of RN01. RN01 Participants. Co-ordinators. 2. RN01 - Mandate for Phase IV.

kohana
Download Presentation

Barents 2020 Final Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DRAFT 2011-12-11 Barents 2020 Final Report RN01 “Co-ordination of Deliverables” Moscow 14 December 2011 Presented by Vladimir Vernikovskij,Russian Coordinator of RN01

  2. RN01 Participants Co-ordinators 2

  3. RN01 - Mandate for Phase IV • Recommend how deliverables should be structured and published • Review deliverables for compliance with the recommendations, • prepare roadmaps for implementation of deliverables • Create awareness among the potential recipients as to what is coming • (e.g. standards organisations) • Provide proposal for an Arctic long term international standards program • (ref. ISO/TC67 MC Ad-hoc group Arctic Operations)

  4. Task 1: Recommendation of deliverables • Report developed and delivered to Steering Committee 7th Dec. 2010 • Recommendations presented at B2020 Conference 9th Dec. 2010

  5. Task 2Review of deliverables and recommendation for implementation

  6. Application Deliverable Recipient RN02 - Ice Loads

  7. RN02 - Commentary

  8. Recipient Deliverable RN03 – Risk Management

  9. RN03 - Commentary

  10. Application Deliverable Recipient RN04 – Evacuation & Rescue

  11. RN04 - Commentary

  12. Application Deliverable Recipient RN05 – Human Factors

  13. RN05 - Commentary

  14. Application Deliverable Recipient RN06 – Ice Management

  15. RN06 - Commentary

  16. Application Deliverable Recipient RN07 – Operational Emissions & Discharges

  17. RN07 - Commentary

  18. Task 3: Creating Awareness Initiatives RN01 participation and presentations: Plenary meeting of ISO TC67/SC7 Singapore, Jan. 2011 ISO/TC67/Management Committee meeting San Francisco, June 2011 where the formation of ISO/TC67 MC AHG “Arctic Operations” were discussed Norwegian Sector Board for Petroleum Standardisation OGP Standards committee meetings OGP Arctic Co-ordination TF meetings Article in OGP Standards bulletin 2011 18 18

  19. Task 4 – Proposal for Arctic Long Term Standardisation 1 2 3 4

  20. RN01 Recommendations to ISO:11 New Work Item Proposals 1 20

  21. ISO AHG 2 • The ISO/TC67 MC Ad-hoc group on Arctic Operations used the Barents 2020 RN01 report as a basis for their recommendations • Recommended to the ISO/TC67 plenary meeting in Moscow, 14-15th September 2011: • to set up a new subcommittee for Arctic Operations • to invite Russia to propose a chairman and secretary. • Re. ISO/TC67 N 1148 Report ISO TC67 MC AHG Arctic operations, dated: 2011-09-07. • .

  22. 3 3 – IOS plenary meeting • The plenary meeting of ISO/TC67 took a resolution in its meeting 2011-09-15 to establish SC8 “Arctic Operations”. • The SC8 work programme will be developed on the basis of the abovementioned work items. • The formal establishment of SC8 has been approved by ISO Technical Management Board • Preparations for the first meeting can start. Detailed new work item proposals are being prepared.

  23. 4 ISO TC67 SC8 • SC 8 work programme to start with about 15 work items, which should include the following subjects and/or standards: • Working environment in connection with cold-climate conditions (1 standard ready in late 2014); • Escape, evacuation and rescue (1 standard ready in early 2014)); • Maintenance of onshore and offshore structures (2 standards ready in late 2014); • Ice management (6 standards ready in 2015); • Onshore and offshore logistics (2 standards ready in late 2014); • Plant security (1 standard ready in early 2014). • The detailed new work item proposals are being prepared.

  24. Thank you for your attention !

  25. Options for final reporting • Barents 2020 technical report • Proposal for Guideline(s) or Recommended Practice(s) • GAZPROM (STO) • DNV (RP) • OGP • Proposal for identical Russian and Norwegian national supplementary standard to an ISO standard • GOST R Standard, Recommendation or “set of rules” • NS or NORSOK standard • Proposal for national annex to adopted ISO or EN-ISO standard • Proposal for ISO Technical Specification (TS) • Proposal for ISO Technical Report (TR) • Proposal for ISO Publicly Available Specification (PAS) • Proposal for ISO International Workshop Agreement (IWA) • Proposal for ISO Amendment to existing standard (Amd)