80 likes | 191 Views
OpenMI Life Demonstration case “Scheldt”. Use case “Linking sewer flow to river flow”. Sewer case. Sewer model (InfoWorks CS) Drainage area of Leuven (approx. 110000 PE, 120 km 2 ). Leuven model characteristics. Approx. 10000 nodes > 100 outfalls / CSOs Open and culverted sections
E N D
OpenMI LifeDemonstration case “Scheldt” Use case “Linking sewer flow to river flow” OpenMI Life Kick-off meeting - October 3-5, 2006 - Aalst (BE)
Sewer case • Sewer model (InfoWorks CS) • Drainage area of Leuven (approx. 110000 PE, 120 km2) OpenMI Life Kick-off meeting - October 3-5, 2006 - Aalst (BE)
Leuven model characteristics • Approx. 10000 nodes • > 100 outfalls / CSOs • Open and culverted sections • Main river (Dijle), larger tributaries, smaller (unmodelled) ditches • Many outfalls unprotected to reverse flows • River sections currently incorporated in sewer model (to be removed) • Model spreads accross 4 main “valleys” • Dijle, Voer, Molenbeek, Abdijbeek OpenMI Life Kick-off meeting - October 3-5, 2006 - Aalst (BE)
River case • River model (InfoWorks RS) • Non-tidal part of Dijle river basin (approx. 900 km2) • Model size: 105 km river OpenMI Life Kick-off meeting - October 3-5, 2006 - Aalst (BE)
River Dijle characteristics • Dijle flows through city centre of Leuven, splits in 5 branches: • Intense contact with sewer system • More inflow from sewers than natural runoff • OpenMI important for model of Dijle in Leuven OpenMI Life Kick-off meeting - October 3-5, 2006 - Aalst (BE)
Linkage description • Quantity links (@ outfalls, CSOs) • Flows from sewer to river • Levels from river to sewer • Flows from river to sewer • Model concept links • Streamlining hydrology of the two models • PDM vs. sewer subcatchments • Flood calculations • Flood cones vs. 2D-flood modelling OpenMI Life Kick-off meeting - October 3-5, 2006 - Aalst (BE)
Challenges - pitfalls • Unravelling the overlaps in hydrology • Linking reverse flows – unstabilities • Combinations of open and predefined boundaries • Initialisation • How to include interactions during PDM calibration ? • Selection of rainfall events - dry weather simulations OpenMI Life Kick-off meeting - October 3-5, 2006 - Aalst (BE)
System requirements • Performance • Stand alone simulation times • Sewer model : 1month ~ 6 h simulation • River model :1 month ~ 3 h simulation • Remote linking - licenses • Expect to have a practicable solution by the end of the project • Give priority in OMAssoc. Techn.Comm. OpenMI Life Kick-off meeting - October 3-5, 2006 - Aalst (BE)