1 / 10

Test beam with Pixel modules

Test beam with Pixel modules. Aims. 2 Modules: 3 GEMs with 8 Timepix chip 8 InGrids Readout is SRS based Possibly with water cooling Production started in January, first parts were delivered in February But central parts had to be diffusion welded at external workshop.

kort
Download Presentation

Test beam with Pixel modules

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Test beam with Pixel modules

  2. Aims • 2 Modules: • 3 GEMs with 8 Timepix chip • 8 InGrids • Readout is SRS based • Possibly with water cooling • Production started in January, first parts were delivered in February • But central parts had to be diffusion welded at external workshop. • This took longer than expected and there were some problems. We • got the last part (for the InGrid module) only 3 days before the test beam.

  3. GEM-Module 2 Oktoboards with bare Timepix chips produced and tested Modules is assembled GEMs tested (500 V @ N2 -> 0.7 nA leakage current) 380 V @ Ar:iButane 95:5 stands for ~30 min.

  4. What happend to the InGrid Module

  5. Assembley of InGrid Module

  6. Inserting the module in LP Everything went well, so we decided to leave the InGrid module in and test it first.

  7. Schedules sofar 21.4. Inserted InGrid module in LP, starting to flash gas (T2K) 22.4. everything set up, started to learn how to handle beam/PCMAG -> killed power supply of readout electronics (too close to magnet) 23.4. replaced power supply, saw first tracks 24.4. equalizing the chips (problems with chip 7 and 8) 25.4. finishing euqalization, adjusting beam, placing SRS at better position 26.4. started data taking (voltage scan)

  8. Position of SRS

  9. Events

  10. Thanks to everyone who was helping!

More Related