1 / 11

New Pixel Telescope in the Meson Test Beam

New Pixel Telescope in the Meson Test Beam. David Christian 4/13/09. MTest Telescope. Constructed using “ BTeV pixels” Goals: System test of detectors Creation of useful test beam infrastructure Pixel size = 50 m x 400 m (600 m )

Download Presentation

New Pixel Telescope in the Meson Test Beam

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New Pixel Telescope in the Meson Test Beam David Christian 4/13/09

  2. MTest Telescope • Constructed using “BTeV pixels” • Goals: • System test of detectors • Creation of useful test beam infrastructure • Pixel size = 50m x 400m (600m) • Oriented to provide “precision-x” or “precision-y” measurements. • Will provide ~6 micron resolution for “device under test” • Can easily handle MTest rates

  3. Collaboration • Multi-year R&D effort for BTeV including a large group from FNAL, Syracuse, Iowa, Frascati, Milano, New Mexico State, Tennessee, Wayne State, & Wisconsin. • Test beam telescope by FNAL, Syracuse, & Columbia U w/sensors donated by LANL. • Key contributions by Bert Gonzalez, Tom Zimmerman, Mike Matulik, CM Lei, Paula Lippert, Tammy Hawke, & Michelle Jonas

  4. Pixel Plane (1/2 Station) FPIX2.1 ROC Pixel Sensor LGA C/L

  5. Pixel Station Readout Card (TBDB)

  6. Pixel Double Station

  7. Layout y y Beam x x • Aperture ~ 3.5cm x 3.5cm • 4 stations

  8. Pixel Tracker (telescope) in MTest

  9. Beam spot (last quads off) 120 GeV proton beam: 1-track events; 3-4 spills at low intensity (5 Booster buckets) 93k tracks 3/20/09 mm mm

  10. Beam phase space Horizontal Vertical mrad mm mm

  11. Plans • Test of irradiated LHCb “VELO” silicon strip detectors starts on Wednesday. • Hope also to test prototype “edgeless” ILC sensor before the summer shutdown. • Plan to add one high precision tracking station next fall (probably MAPS w/~2m resolution).

More Related