1 / 22

Asian Monsoon Years (AMY) Brief Review and Expectation

Asian Monsoon Years (AMY) Brief Review and Expectation. Guoxiong WU. 26 January, 2008 Yokohama, Japan. 1st AMY Workshop Asian Monsoon Year 2008 (AMY08) International Workshop April 23rd-25th, 2007 Beijing, China.

kyne
Download Presentation

Asian Monsoon Years (AMY) Brief Review and Expectation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Asian Monsoon Years (AMY)Brief Review and Expectation Guoxiong WU 26 January, 2008 Yokohama, Japan

  2. 1st AMY WorkshopAsian Monsoon Year 2008 (AMY08)International WorkshopApril 23rd-25th, 2007Beijing, China

  3. More than 50 scientists from 13 countries and regions are attending this workshop.

  4. Self introduction Agenda approval Session 1: Introduction of relevant programs – 1.5 days; Session 2: Coordinate the field experiments: observation sites, periods, variables and the need of Intensified Observation Periods (IOP); Session3: Discuss the data sharing, assembling, quality controlling and assimilation-- 0.5 day; Session 4: Modelling and prediction –0.5 day; Session 5: IMY & Set up working groups and Scientific Steering Committee–0.5 day.

  5. 2nd AMY Workshop Following the resolution of the First International Workshop on AMY’08 at Beijing, the Second AMY’08 workshop was held at Bali, Indonesia on September 3-4, 2007. The major objectives of 2nd workshop are to discuss and finalize the Science plan and Implementation Plan for AMY’08.

  6. AMY’08 Science and Implementation Plan http://mahasri.cr.chiba-u.ac.jp/ Jun Matsumoto & Bin Wang The 2nd AMY’08 Workshop at Bali, Indonesia, September 3-4, 2007 Kuta Beach in the morning of September 2, 2007

  7. AMY Some concluding remarks Howard Cattle

  8. AMY • AMY brings together some 21 regional projects plus other national and international programme contributions. But what does AMY bring us? • At one level, AMY acts to provide communication between these facilitating interactions between them • Challenge is to meld AMY into a coordinated international programme rather than a loose collection of projects/activites - on way (this meeting) • Science plan - still work to do on observation, modelling and data management issues • How will AMY be delivered - need for focussed Implementation Plan

  9. AMY Science Plan • Science Plan identifies a wide range of science questions; classified according to timescale (diurnal -> decadal) and against a number of science foci: • Science plan objectives which emerge are focused around: • Ocean-atmosphere interaction • Land-atmosphere interaction • Improve skill in seasonal to interannual prediction of the Asian monsoon • Development of a hydrometeorological prediction system and database • Human interactions with the monsoon • SSC plus Working Groups are against observations, modelling and data management • Doesn’t yet bring a fully coordinated science approach between inputs and objectives

  10. Classification of projects • Continental hydroclimatology; land-atmosphere interactions and weather-monsoon interactions • Impact of the Tibetan Plateau • Aerosol/cloud/radiation/water cycle interactions • Ocean-atmosphere interactions; tropical cyclones • Monsoon prediction including climate trends • Interactions between human and natural components Plus contributions from wider national/international activities 1-3 above part of land surface interactions overall. Hydromet prediction system can be added in (MAHASRI)

  11. Classification of Projects Plus other National & International contributions

  12. Implementation Plan strawman • Overall aims and objectives of AMY & key deliverables • Overall strategy for implementing AMY • How/do the project activities integrate? • Cross programme integrated modelling and observational programmes and data management • Links to international activities • Others…

  13. IP - development • Finalize science plan - soon • Develop IP asap through e.g: • SSC (Sections 1, 2, 5) • Working groups (Sections 4) with feed in/interactions with: • Email science area groups (Sections 3.4) each led by SSC member against mapping of projects to existing objectives or Land surface interactions Hydroclimatology, weather Tibetan Plateau Aerosols Ocean interactions Monsoon prediction Hydromet prediction system Human interactions • Timescale - over next few months?

  14. AMY-08 • AMY “year” 08/09 • Many projects extend beyond this • Some have main phase on later timescale (e.g CTCZ) • What is vision beyond 08/09? • Should timeframe be extended? e.g • 08-09 spin up period • 09/010 main AMY year • 010-011 consolidation phase • Logo?

  15. AMY Logo prepared by AMY Office for selection 1 2 3 6 4 5

  16. 3rd AMY Workshop Finalize the AMY SP and IP; Activate Working Group Coordination; bring coordinated science approach between inputs and objectives Schedule the Activities in 2008/2009; Discuss the Strategic Plan of IMS…

  17. Science Plan for Asian Monsoon Years (2007-2011)--- AMY (Revised, January 19 2008) Table of Content Summary 1. Introduction 1.1 Programmatic development 1.2 Participants 2. Background 2.1 Observational and process studies 2.2 Modeling and prediction 2.3 The monsoon environment and its future change 3. Science foci 3.1 Cross-cutting themes 3.2 Overarching science questions

  18. 4. Goals and objectives 4.1 The overarching goals 4.2 Objectives 5. Strategy 5.1 Balanced and integrated approach 5.2 Geographic foci and capacity building 5.3 Utilization of satellite observations 5.4 Organization 5.5 Collaboration and linkages 6. Planned activities 6.1 Observations 6.2 Data management 6.3 Modeling and prediction 7. Expectations

  19. Good Luck to AMY! Thank You!

  20. Good Luck to AMY! Thank You!

More Related