Contract Options Overview

Contract Options Overview. PM/CAM Training H. Jeff Moore May 11, 2009. AGENDA. Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency. HECOM UPDATE POSTED. CONSTRUCTION. Contract Administrators - Health Science

kyoko
Download Presentation

Contract Options Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Contract Options Overview PM/CAM Training H. Jeff Moore May 11, 2009

  2. AGENDA • Overview • CM at Risk • Design (Completion) / Build • Lunch Break / Discussion – 11:30 AM – 12:30 PM • CM Agency

  3. HECOM UPDATE POSTED

  4. CONSTRUCTION Contract Administrators - Health Science Martin Best Bill Martin

  5. CONSTRUCTION Contract Administrators – Academic George Cullen Julie Garmel

  6. 1995 – Trial Approval from DEB & Attorney General to Use CM Agency for Law School Renovation & Expansion

  7. CM Agency Advantages • VM & Constructability Savings • Team Player vs. Adversarial Relationship • Reduced Trade Contractor Claims & Litigation – Especially in Occupied Buildings with Unforeseen Building Conditions • No Conflict of Interest • Involvement During Design Phase Reduces Risk & Lowers Fees • Flexibility to Adapt to Changing Conditions • Establishment of “Real” Costs & Contingencies

  8. CM Agency Advantages • Full Disclosure on Project Cost Status Reducing Risk • Respected/Efficient/Well-Managed CM Receives More Competitive Bids • Elimination of Document Conflicts & Overlap Reduce Change Orders • “Complete” Documents for Procurement • Minimize Disruption to Clients • Reduce Overall Design & Construction Duration • Determine Requirements for Off-Hours Work Early • Package Project for Best Trade Pricing

  9. CM Agency Advantages • Solicit & Generate More Interest in Each Trade • Proactive Approach to Material & Equipment Procurement, Labor Issues, Potential Delays • Full Disclosure of Project Schedule Status • CM Expertise Provides “Hard” Figures on Project Cost Minimizing Potential For Trades Being Over Budget • Protect the Reputation of Clients & Their Ability to Teach/Conduct Business/Earn Income

  10. Contract Options for CMs/Contractors • CM At Risk w/Design Phase – Multiple Contracts; > $5M • Design (Completion) / Build • CM Agency w/Design Phase; > $20M • Competitive Negotiation Contractor – Fixed Price – Versions I (+$5M), II ($2 to $5M), & III (< $2M) - Trade Packages

  11. Additional Options • Competitive Sealed Bid – Construction Only • Select Bidders for IFB • On-Demand; < $5M • Academic (16); Academic Research (8); Medical (7); Roofing (5) • Special Projects (4) – Requires Rapid Construction Response; < $2M • Sole Source • Emergency

  12. General Issues • Current Advertisements – http://www.fm.virginia.edu/fpc/ContractAdmin/ ConstructionAdvertise.htm • RFPs vs. IFBs • RFP process increases procurement workload (short-listing, interviews, etc.) • Contract Admin. review & editing of RFPs • Coordination w/ Legal (Steve Rosenberg) on Contract Documents & Bonding

  13. Introduction to Process Basics • Short-listing • Licensed in Virginia; Bonding Capacity • Firm Experience • Schedule & Cost Control • Similar Project Experience by Proposed Team • SWaM • HECOM /UVA Experience • Firms May Request to be Added to List

  14. Introduction to Process Basics • Technical Proposal - Categories & Weighting • Key Personnel, Experience & Qualifications – 30 to 35% • Past Performance and Experience – 20 to 25% • Management Capability/Project Plan/Schedule (Value Management) – 25 to 30% • Value Management – 0 to 10% • SWaM Firm Utilization – 10%

  15. Introduction to Process Basics • CM Price Proposal – Key Components • Document Review, Procurement, & Construction Phase Services • Home Office Overhead & Total Profit • Field Office Staff Costs • Field Office Staff General Conditions • Other GC Fixed Price Risks/CM Contingency (At Risk)

  16. Introduction to Process Basics • Competitive Negotiation & Design/Build Price Proposal – Key Components • Lump Sum Pricing with Options/Breakdown (i.e. Design Completion for D/B, Construction Packages) • Unit Prices (i.e. Soils, Rock) • Additive Price Items

  17. Introduction to Process Basics • Proposal Scoring • 75% Technical / 25 % Price – CM At Risk & Agency with Design Phase Services • 50% Technical / 50% Price – Design / Build & Competitive Negotiation (Significant Construction Component)

  18. Introduction to Process Basics • Document Review Phase Services • Design Review • Constructability Review • Estimating • Scheduling • Phasing • Value Management (VM) • Trade Packaging • LEED & Commissioning

  19. Introduction to Process Basics • Construction Phase – Pricing • Proposals (Bids) • Select Additive Price Items • Evaluate / Negotiate VM Proposals • Finalize Contract Amount Within Budget

  20. AGENDA • Overview • CM at Risk • Design (Completion) / Build • Lunch Break / Discussion – 11:30 AM – 12:30 PM • CM Agency