An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LNGS Scanning Station Nicola D’Ambrosio (LNGS group) Maiori, 4-6 June 2007

  2. CS Scanning Station: presently activities • CSd measurement and analysis • On-Line and off-line ESS improvements • (New Filters, brick X-ray measurement, …) • CS Scanning improvements (soft../Hard…) • CS X-Ray system development and management • Automatic emulsion changer (oil option) development • Bricks / CS handling and shipment organization … • General maintenance (lab environment, network, processing PCs) • PENAUT analysis

  3. Scanning station: April 2007 run 2 shifts/day - 1 Physicist /shift (LNGS people available and on-call) 4 microscopes dedicated : used only 3 (1 microscope had a camera problem, now solved) - 1 microscope used for PENAUT analysis - - 1 microscope at TecnoCut for automatic changer tuning -

  4. Scanning station shifts List (April 2007 Run) CSd measurement started on 17/5 A new call is under way for 1÷2 weeks in June

  5. Scanning station CSd analysis (April 2007 Run) • 18 CSd measured from first extraction • 19 CSd measured from second extraction • 37 CSd in 11 Days • (36÷15 cm2 around prediction) • Detailed results of this analysis will be presented by Luillo

  6. Comments • On-Line scanning parameters tuning needed • on “real” CSd emulsion • No information on efficiencies for “large angle” • ( > 400 mrad) • We need a new set of emulsion for efficiencies check • using “presently” CSd-like emulsion + large angle set • New test beam ?

  7. Scanning station : 2007 September Run 24 hours/day 6 microscopes operative 3 shifts/day (8 hours) - 2 person/shift (1 Physicist from the collaboration, 1 ext. man power ) ~ 1 CSd / system / day (considering also NC) In total 6÷8 CSd/day can be analyzed at LNGS

  8. Scanning station : near future plan Setting Up of the CS Analysis parameters (On-Line and Off-Line) Re-Measurement of the CSd (April 2007 run) A soon as they are available -> tuning of the other 3 microscopes Tuning of the data flow into the computer infrastructure (Data access via Central DB !!!)

  9. CSD full surface analysis: Emulsion on scotch tape Vacuum channel Emulsion Scotch Tape

  10. CSD full surface analysis • Preliminary quality test DONE : • CSD prediction from August Run measured and confirmed • Event found 98 times on 100 measurements • Future tests: new scotch, un-gluing emulsion effects, precise • measurement near the border. • Presently we manually glue the emulsion on scotch • with a “simple tool”: not so easy to get good result • Professional gluing machine will be soon available (Bologna) • New prototype of glass with large perimeter channel • is under construction (Bologna)