CHAMBER PRODUCTION AT CERN 904. RPC upgrade-meeting, 08.jan.2014 Dong- hyun Kim on behalf of the cern-904 team Department of physics, sungkyunkwan university, korea. Content. Status of 904 site Data Analysis Plan. 1 . Status of 904 site. Visual test – 17 BO Gaps
E N D
CHAMBER PRODUCTION AT CERN 904 RPC upgrade-meeting, 08.jan.2014 Dong-hyun Kim on behalf of the cern-904 team Department of physics, sungkyunkwan university, korea
Content • Status of 904 site • Data Analysis • Plan
1. Status of 904 site • Visual test – 17 BO Gaps • Made 3 HV-Connector • Still waiting a Gas back • New india-student coming
2. Data Analysis • Study for Muon Efficiency at = 8TeV(Full pile-up events) • MC : MC : /DYToMuMu_M-20_CT10_TuneZ2star_v2_8TeV-powheg-pythia6/Summer12_DR53X-PU_S10_START53_V7A-v1/AODSIM • RD : /SingleMu/Run2012A(B,C)-22Jan2013-v1/AOD • Json file : Cert_190456-208686_8TeV_22Jan2013ReReco_Collisions12_JSON.txt
2. Data Analysis • For IDIso - μ+
2. Data Analysis • For IDIso - μ+
2. Data Analysis • For IDIso -μ+
2. Data Analysis • For STA - μ+
2. Data Analysis • For STA - μ+
2. Data Analysis • For STA -μ+
2. Data Analysis • For Tracking - μ+
2. Data Analysis • For Tracking - μ+
2. Data Analysis • For Tracking -μ+
3. Plan • Calculate Trigger Muon Efficiency • Leak test for the BO Gaps • Dark-current test for the BO Gaps • Make the HV-Connetor