TDC2TCC2 Réunion de chantier 6. 06.12.2013 In sharepoint : https://espace.cern.ch/sba-workspace/tcc2wg/LS1%20worksite%20meeting/. Statut. 3 splitters en zone de stockage VIC MDLV le mercredi 11/12 à 9.30 sur place (BA80) Visite GS-CE à planifier en S50

lars
Download Presentation

TDC2TCC2 Réunion de chantier 6

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TDC2TCC2 Réunion de chantier 6 06.12.2013 In sharepoint: https://espace.cern.ch/sba-workspace/tcc2wg/LS1%20worksite%20meeting/

  2. Statut • 3 splitters en zone de stockage • VIC MDLV le mercredi 11/12 à 9.30 sur place (BA80) • Visite GS-CE à planifier en S50 • Planning repérage EN-EL à organiser selon plans fournis • Bilan des doses

  3. Splitters

  4. Zonage repérage EN-EL

  5. MDLV