90 likes | 196 Views
Magellan telescope projects. SAC Meeting September 2005. Magellan telescope projects status. Instrument chiller control Finished. Magellan telescope projects status. Flow measurement in Telescope Chiller Finished. Magellan telescope projects status. Compressor Air pressure monitoring
E N D
Magellan telescope projects SAC Meeting September 2005
Magellan telescope projects status • Instrument chiller control Finished
Magellan telescope projects status • Flow measurement in Telescope Chiller Finished
Magellan telescope projects status • Compressor Air pressure monitoring Design completed
AD1 AD2 Micro controller Signal Conditioning Module 5 LVDT LOAD CELL AMPLIFIER Load Cell 2 HPSTEP LIMIT OVERRIDE STEPPER MOTOR DRIVER RELAY INTERLOCK 5 HPDIR DIR Stepper Motor ENAB HPENAB IN OUT 2 PC Proximity Switches Block Diagram
Test bench first results Load cell output vs. time