Avera Therapy Addition December 2011 Update

Walls framed, electrical/plumbing rough-ins ongoing, masonry façade complete. Exciting progress toward completion of the Avera St. Luke's therapy addition. Kudos to the design and construction team!

laszlo
Download Presentation

Avera Therapy Addition December 2011 Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Avera Therapy Addition December 2011 Update

  2. Walls Framed • All of the interior walls are framed on the addition and drywall installation will be about 1/3 complete by the new year

  3. Mechanical/Electrical Wall Rough in Ongoing • Electrical and plumbing rough-in for the walls is complete • Fire Sprinkler rough-in will be started by the first of the year • Mechanical above ceiling will be complete except for drops and diffusers by the new year

  4. Masonry Façade Complete • Exterior masonry will be complete for the new year • South elevation of addition is architecturally appealing with a mixture of brick, stone and precast

  5. A Great Job by BWBR Architects, Avera St. Lukes, Huff Construction and the rest of the design and construction team!