Contents • Budapest facts and figures • Current status of the bus sector • Challenges for better services • The new model • Lessons learnt
Budapest facts and figures Budapest / the Capital (since 1873): • 1.700.000 inhabitants • 600.000 car trips/day • Modal Split: 60% personal/ 40% public • 3,56 million passengers/day on BKV Agglomeration (Pest County, 80 settlements): • 800.000 inhabitants • 400.000 car trips/day (66% of all trips!)
Budapest facts and figures Two level municipal system (since 1990): • Municipality of the City of Budapest (the Mayor of Budapest) • 23 municipalities (23 mayors) of 23 districts Transportation tasks of the Municipality of the City of Budapest:[National Law LXV.1990.63.A§ g] • Public transportation • Traffic management on the whole road network of Budapest (4500 km) • Road and bridge maintenance tasks on roads and bridges owned by the City of Budapest, or used by public transport (1000 km) • Transportation developmentprojects • Permitting and legal control
Budapest facts and figures Road network: • Full length of the road network: 4500 km • Length of the main road network: 1200 km • 9 Danube road bridges (including M0 bridges) • Over 1000 traffic signaled intersections Public transport network: • Length of the public transport network: 1100 km • Number of stops and stations: 4700 • Rolling stock: app. 3000 vehicles (176 million km run) • Average occupancy of vehicles: 23,8% • Average circulating speed of vehicles: 16,7 km/h • 1,37 billion passengers/year, 5,1 billion passenger km/year
Budapest facts and figures New transport management model (since 2010):
Budapest facts and figures General tasks of BKK: • Ordering services of public transport (network planning, commission, control, issuing and controlling tickets, regional coordination) • Operationof roads, bridges and the traffic management system (development and coordination of reconstruction and construction works) • Integratedadministration and developmentof urban transportation (elaboration and updating of transport strategy, development and management of projects, professional coordination) • Elaboration and operation of general transportation regulatory systems (parking, congestion charging, heavy weight traffic charging)
Current status of the bus sector • Bus servicefacts and figures: • Share: 40% • 556 million passengers p.a. • 177 million vehicle kms • full geographical coverage • 7/24 service • 206 bus lines (daytime) • 38 night bus lines • Peak hours passenger load above 90% on 80% of the lines, average passenger load 24.0% • OPEX HUF 40 billion (EUR 135 mn) per annum • Total number of passengers 1.39 million per annum
Current status of the bus sector • First-door alighting to be extended gradually • Operational and planned replacement of BKV’s fixed-rail services • Mid-term general goals: • more fixed-rail services • less bus services • Automated fare collection to be rolled out (fully managed by BKK) • GPS-based AVL system to be mounted on all surface vehicles (even private operators) • Gradual shift to the competitive tendering model
Current status of the bus sector • Bus fleet facts and figures: • 1,353 buses • 624 pcs „articulated” (18m-long) • 698 pcs „solo” (12m-long) • 31 pcs „midi” (8m-long) • Average age of fleet: 18.13 years • BKV’s subcontractors: • 2 operators (1 private, • 1 government controlled) • own depots
Current status of the bus sector IK 415 160 pcs Volvo 7700 A 150 pcs IK 412 114 pcs IK 260 377 pcs IK 280 270 pcs IK 435 171 pcs
Current status of the bus sector Bus fleet vs. services: • Many break-downs and cancellations • 75% high-floor • 83%no A/C • Mostly EURO-0, up to EURO-III • Deteriorated outlook, passenger area
Current status of the bus sector • Bus depots of BKV: • 4 bus depots • 1 trolley bus + bus depot • 300-350 buses per depot • all owned by BKV • on-site petrol stations • on-site car wash • Full Wi-Fi coverage (as part of the AVL system „FUTÁR”) • Not to be sold – can be utilized by future private operators
Challenges for better services • Main questions related to the new model: • How to deal with current technical conditions of the fleet? • How to involve private funding? • How to improve services for passengers? • How to generate competitive pressure for BKV?
The new model Main aims of the new bus model: • Hundreds of low-floor, air-conditioned, EURO-5 or EEV buses to be put into operation until 2014 • No CAPEX • Competitive tendering • Cheaper, more efficient, better • Risk-sharing between BKK and the operators • BKV’s bus operations: competitor and benchmark
The new model • Competitive framework: • EU public procurement directives, HU public procurement law • Two phases: • Prequalification: open for application for years – since 21/10/2011 • Competitive tendering: actual call for tender for those operators who have successfully passed the pre-qualification • First tender due: December 2011 • „Larger” and „smaller” fleet contracts • Contract term depending on age of fleet; with new buses planned term: 8 years • Planned contract sizes between 50 and 300 buses
The new model • Service level agreements: • Punctuality • Cleanliness • Passenger comfort (heating, A/C) • Strict control regime: • Incentives and penalties – „bonus-malus” (stick / carrot) • Ever increasing service level control • BKK-managed AVL system to track each vehicle • Target: high quality services
The new model • Gross cost contracts: • Km-based service fee • Service fee to be reviewed per annum • Fare revenue to be collected by BKK • Contract term: • Based on turnover of CAPEX and 1370/2007/EC • Average planned contract term 7-8 years • Option to extension • Risk-sharing, spreading of costs: • Minimal standards to be set • Application of greatest possible freedom for operators • Target: acceptable service fee
The new model Costs: Factors on possible price increase Potentials to decrease costs • Experience of operatorsExperience with cheaper buses, existing processes, workflows • More efficient processesMaintenance, roistering, ever increasing cost optimization • Risk coverageOverhead costs spread across other activities • Higher amortizationBKV’s buses are amortized to zero now • Higher maintenance costsHigher qualified maintenance staff and more expensive • More diesel used by new busesNew technology, A/C increases fuel consumption • RisksDiesel price increase, use of BKV depot, trade unions
The new model Roll-out of the new service framework: 2012 2013 2014 2015 Phase 0 „urgent” Public procurement preparation Tenders Service provision 150 pcs 450 pcs 750 pcs 900 pcs • Phase 0: replacement of BKV’s subcontractor contracts (until 1/5/2012) • Tenders: gradual and continuous increase of number of contracts and operators • Target: more than half of the fleet size are new buses on the new tender regime
The new model The first tender: under time pressure… Phase 0 (under time pressure) Later phases service framework • Tenders from 1/5/2012 • BKK to procure • Long-term contracts • Smaller and larger fleet sizes (100-300) • Only new buses • High quality expectations • Service contract with operators • Competitive tendering • Redistribution of buses on the network • BKK-BKV consortium to procure • Short-term contract(s) (1-2 years) • Small fleet size (25-50) • Acceptance of high-floor/low-entry buses • „Compromises” on technical expectations • Subcontracted to BKV • Direct contract award • Service to start on 1/5/2012 • Buses to be distributed across the Budapest bus network (mixed with BKV buses)
The new model • The first tender: urgent need to actquickly • BKV’s Public Service Contract and BKV subcontracts expire on 30/4/2012 • Before 1/5/2012 BKK had no authority to conclude procurement and award contracts • BKV has no extra 110 buses for replacement • New contract needed to provide capacity • Time pressure leads to phase 0 „contradictions” with the new service framework
The new model 2012 2011 November December January February March April 44 45 46 47 48 49 50 51 52 13 14 15 16 17 1 2 3 4 5 6 7 8 9 10 11 12 Activities Week • BKK internal decisions • Prequalification • BKK to draft tender documents • Submission of applications • Evaluation of applications • Negotiations with applicants • RFP • Decision by BKK/BKV • Room for appeal • Contract Award • Preparation for Service Provision
The new model Service contracts Part 1 to 6
The new model • Service contracts Part 7 and 8: • Part 7: 25 new solo buses + 200% optional • Part 8: 25 new articulated buses + 200% optional • Specifications: • Low floor, with ramp • Minimum EEV engine • Additional points for the alternative propulsion (CNG, hybrid, electric etc.) • Air-conditioning • Built-in CCTV security system • Built-in passenger counter system
Lessons learnt • Main lessons after the first tenders: • No real bonus/malus: only penalties can apply due to the Hungarian procurement procedures → new regulation? • BKV is not allowed to bid on these procurements → New prequalification tender without BKV • Only Hungarian bidders → minimum fleet size to bid for new market is around 200 • No Hungarian buses → ??? • No change: • Integrated bus fleet control remains in the responsibility of BKK (FUTÁR system will be integrated on all vehicles) • Continuous quality control to be performed