1 / 1

O 2 - production (peak Mcpm)

A. B. fMLF. WKYMVM. 500. 500. 1000. 1000. O2- integral (Mcpm). O2- integral (Mcpm). 500. 500. 400. 400. 0. 0. 1   5. 1   5. Control. Control. PBP10 (  M). PBP10 (  M). 300. 300. O 2 - production (peak Mcpm). O 2 - production (peak Mcpm). 200.

leland
Download Presentation

O 2 - production (peak Mcpm)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A B fMLF WKYMVM 500 500 1000 1000 O2- integral (Mcpm) O2- integral (Mcpm) 500 500 400 400 0 0 1   5 1   5 Control Control PBP10 (M) PBP10 (M) 300 300 O2- production (peak Mcpm) O2- production (peak Mcpm) 200 200 100 100 0 0 0 2 4 6 0 2 4 6 Time (min) Time (min)

More Related