Source Control in the Duwamish Waterway Seattle Public Utilities October 30, 2009

Source Control in the Duwamish Waterway Seattle Public Utilities October 30, 2009. Today’s Presentation. Business Inspections Source tracing/characterization Compare Lower Duwamish Waterway site with East Waterway site source tracing results. Lower Duwamish Waterway Site. Storm drain basin :

leola
Download Presentation

Source Control in the Duwamish Waterway Seattle Public Utilities October 30, 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Source Control in the Duwamish WaterwaySeattle Public UtilitiesOctober 30, 2009

  2. Today’s Presentation • Business Inspections • Source tracing/characterization • Compare Lower Duwamish Waterway site with East Waterway site source tracing results

  3. Lower Duwamish Waterway Site Storm drain basin: 8,900 acres 240 outfalls

  4. Lower Duwamish Waterway Site Storm Drain Basin

  5. Lower Duwamish Waterway Site Storm drain basin: 8,900 acres 240 outfalls Combined sewer service area: 20,000 acres 10 outfalls

  6. Lower Duwamish Waterway Site

  7. Lower Duwamish Waterway Site Storm drain basin: 8,900 acres 240 outfalls Combined sewer service area: 20,000 acres 10 outfalls

  8. Lower Duwamish and East Waterway Sites LDW Storm drain basin: 8,900 acres 240 outfalls Combined sewer service area: 20,000 acres 10 outfalls EW Storm drain basin: 805 acres 35 outfalls

  9. Lower Duwamish and East Waterway Sites LDW Storm drain basin: 8,900 acres 240 outfalls Combined sewer service area: 20,000 acres 10 outfalls EW Storm drain basin: 805 acres 35 outfalls Combined sewer service area: 4,800 acres 3 outfalls

  10. Lower Duwamish and East Waterway Sites Storm Drain Basin

  11. SPU Business Inspections • Stormwater • Industrial waste • Hazardous waste • Spill prevention and control 2003-2009: LDW: 2,280 inspections EW: 720 inspections

  12. Corrective Actions

  13. SPU Source Tracing • Sediment traps • Inline grabs • Catch basins • Onsite at businesses • Public right-of-way (ROW)

  14. Source Samples LDW (596): • 123 Onsite catch basins • 137 ROW catch basins • 158 inline grabs • 178 traps EW (95): • 46 Onsite catch basins • 23 ROW catch basins • 10 Inline grabs • 16 sediment traps

  15. PCBs LDW EW >100,000 PCBs (ug/kg dw)

  16. PCBs--LDW

  17. PCBs--LDW

  18. PCBs--EW

  19. BEHP LDW Frequency EW Frequency BEHP (ug/kg dw)

  20. BEHP: LDW

  21. BEHP--EW

More Related