1 / 3

Status on AGS cold snake

Status on AGS cold snake. Everything is buttoned up. Cryo work today to make it operation. Expect the cool-down starts before Friday night. Low level testing once the magnet is cooled Full testing Ready to deliver

lev
Download Presentation

Status on AGS cold snake

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status on AGS cold snake • Everything is buttoned up. Cryo work today to make it operation. Expect the cool-down starts before Friday night. • Low level testing once the magnet is cooled • Full testing • Ready to deliver • Estimate still holds for March 30. Could be a couple of days earlier if everything goes smoothly. Wednesday Experiment Meeting BNL, Upton

  2. Status of AGS • Pp accelerated in the AGS with warm snake. Injection polarization was measured as 80% with the E880 polarimeter • Commission the AGS CNI polarimeter • Setup the rf dipole driven coherences at the 4 strong resonances • Set up proper tunes and chromaticity • Check the timing • AGS injection matching Wednesday Experiment Meeting BNL, Upton

  3. Status of RHIC • A ramp for Physics at 100GeV is prepared(pp21) • Preparing pp22 for the 200GeV ramp • BPM Plans • Fix the snake and rotator bpms during the access time • BPM integrity checkup • goal: to get rid of all missing wiring problem • Double check the DX bpms at IP12 for Jet and BPMs for CNI polarimeter • CNI polarimeter: on schedule • H Jet polarimeter: on schedule Wednesday Experiment Meeting BNL, Upton

More Related