1 / 53

Darrell Jones Jason Ballard Dagny Wright

2. Mission Statement Washington School District. Sunnyslope School is a community-based school dedicated to the betterment of families in the community. The school has developed partnerships with the local community organizations and businesses. Together we promote a sense of caring an well-being fo

lew
Download Presentation

Darrell Jones Jason Ballard Dagny Wright

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. 1 Darrell Jones Jason Ballard Dagny Wright

    2. 2 Mission Statement Washington School District Sunnyslope School is a community-based school dedicated to the betterment of families in the community. The school has developed partnerships with the local community organizations and businesses. Together we promote a sense of caring an well-being for the children and families in the community.

    3. 3 Goal of Case Study The goal of this case study of the Washington school district in Phoenix, Arizona is to implement an enterprise-wide network which will include local area networks (LANs) at each site and a wide-area network (WAN) to provide data connectivity between all school sites.

    4. 4 User Requirements Student access to student files and applications Faculty and Administration access to files, applications, forms, and records Students, faculty, and administration access to the Internet from any location Access to the network as the school experiences growth, as needs for applications change, and as new technologies are implemented www.intergate.com/~anidar/network_requirements1.html

    5. 5 Data Center, Shaw Butte and Service Center

    6. 6 WAN and LAN connection drawing, District Two-Layer Architecture

    7. 7 Data Center Router connection to Sunnyslope Show MDF and IDF Cabinet, rack

    8. 8 WAN Design Overview Diagram showing double firewall and connections to email, web, and email servers attached to WAN. Placement of servers, vendor, monthly cost? Delete slide ????

    9. 9 WAN Overview ITProcurement.com Three 8-port T1 WICs with CSU/DSU for each router ISDN interfaces for redundancy Part number:PA-MC-81T Cost of each card: $7795.20 Cisco 7513 router from Infinity Micro, 13 slot 2 Cybus. Direct ship (3 routers for Core. $16, 004. Open account 800-58901234. CSU/DSU built-in. Cost: $16,000 Total Cost for each hub: $56,000

    10. 10 WAN Overview Cisco 2610 routers for schools and double firewall WIC-1-DSU-T1, 1 port T1/fractional T1 DSU/CSU WAN interface card Cost of frame relay\T1 connections and monthly charges Internet connection to Frame Relay Double-firewall (with ACLs assigned)

    11. 11 Sunnyslope Router Cisco 2610 WIC-1-DSU-T1 NM-2CT1-CSU, cost: $4,379 2 port channelized T1/ISDN PRI with CSU network module NM-4E, Cost: $2,939.99 4 port Ethernet Network module Vendor : Microwarehouse Cost: $1475.99 Part number: DEB2140

    12. 12 WAN Security Is based on a two-layer hierarchical model Provides network connectivity between three regional Hubs (the WAN Core) Allows for schools to connect to the WAN core based on proximity to their particular Hub. www.intergate.com/~anidar/network_requirements1.html

    13. 13 Sunnyslope-LAN to WAN Private LAN ip addressing and connections to public WAN, ip addressing, subnet masks

    14. 14 Sunnyslope LAN Overview Subnet, private addressing, ip and ipx support within LAN, ipx addressing Naming and labeling conventions/schemes Device-Building-room Example: SWI-B100-1 SW=switch I or M for intermediate distribution facility or main distribution facility B=building Room numbers (closets, any room)

    15. 15 Router Configurations\ Commands IPX ISDN Frame relay PPP ACLs IGRP

    16. 16

    17. 17

    18. 18

    19. 19

    20. 20

    21. 21

    22. 22

    23. 23

    24. 24 Copy previous slide and show s0, s1, and other interfaces with ip addresses, ip subnets, and ipx addresses Example on left

    25. 25 Extra??????

    26. 26 MDF Connections to IDFs, location of switches for VLANS Purpose of VLANS for administration and curriculum\students. Access between VLANS is provided by a router. Show placement and connection to router Slide for MDF closet and slide for IDF closet, with sample labeling conventions POP

    27. 27 MDF Closet

    28. 28 IDF Show typical closet arrangement based on EIA/TIA 568 standards Five Catalyst 2950G-48-EI Vendor: CompuAmerica Cost: $2449 Fiber patch panel

    29. 29 Sunnyslope VLAN Diagram, how horizontal cabling supports connections to the classrooms IDF switches and classroom switches Cisco Catlyst 2950 Series

    30. 30 Other purchases Place on appropriate slide Ups/generator Racks Locking cabinets for classrooms Decorative molding

    31. 31 LAN Security Will be implemented in LANs for each school and district office Will be implemented with a VLAN, isolating administration and curriculum traffic

    32. 32 Typical Classroom Arrangement Drawing, teacher computer, printer, 24 students connections, WAN/Internet connection. Jacks, switches, cabinets, locks, other classroom security aspects

    33. 33 Classroom Switches Cisco Catalyst 2950-24 Series Vendor Part number: WS-C2950C-24 24 port 10/100 autosensing, autonegotiating catylyst switch $995 each 100 switches (2 per classroom) @ cost of $99,509

    34. 34 Typical Classroom

    35. 35 Cabinets for Classroom Vendor: SRO Wall mount cabinet 19” EIA Rack Mount 28” tall Cost: $449.00 50 Classrooms Total cost: $22450

    36. 36 Racks for MDF and IDFs Vendor: SRO Six racks 40U Universal Servfer Rack Mount Cabinet 19 inch Network Equipment enclosure 32” deep Cost: $1472.47 each Total: $8832

    37. 37 Cabling Vendor-SIGNAMAX SIGNAMAX Connectivity Systems www.controlCable.Com Cat 6 Keystone Jacks, 4 and 1 plug jacks Cat 6 Patch Cables Cat 6 Patch Panels Reasons for using Cat 6-support high-bandwidth applications, meet future requirements SignaMax Kj458-C6 Cat 6 Keystone Jack, light ivory Item SG-120-1 ($7.00 each)

    38. 38 Jacks, Patch Cables 50 four-plug jacks @ $7.00, total cost: $350 11 single-plug jacks (for administrative offices) @ SignaMax KJ458-C6, Cat 6 Keystone Jack, Light Ivory Part number: SG120-1

    39. 39 Decorative Molding Vendor: Hellermann Tyton Tyton TSR2FW-8A Raceway 1-1/4 inch Cust w/ adhesive office white Lengths: 8 foot sections 4 Raceways per room (6 cables each) Cost:$7.55 Part number: 68284-8 Total cost:$1600

    40. 40 SIGNAMAX Connectivity Cat 6 Patch Cords Transmission performance and signal integrity SignaMax C6-114BK-10FB, Cat 6 patch cord w/snag-proof Boot 10’ black (other colors available). Part number-SG114-10BLK ($5.40 each)

    41. 41 Patch Panels SignaMax 24458-C6, 24 port Cat 6 Patch Panel, SG111-24, ($170 each) SignaMax 48458-C8, 48 Port Cat 6 Patch Panel, part # SG111-48, ($320 each) SIGNAMAX Connectivity

    42. 42 Patch Panels Six fiber patch panels Vendor-Ram Electronics Cost: $30.26 Part number: MTRJ-Panel-16 For 19” rack, 16 port, 1U unloaded Total cost: $180 Six Cat 6 patch panels Vendor: SignaMax Cost: $320 Part number:SG111-48 48 port Cat 6 Total cost: S1920

    43. 43 Cabling and Connectors Microwarehouse Cat 6 32000 feet Belkin FASTCAT6 Gigabit 4PR Solid, PVC 1000 Blue DBC1874BL, $129.95 per 1000 feet Total Cost: $4158.00

    44. 44 Fiber Cabling Vendor: Stonewall Cable Fiber lengths: 3031 feet Fiber Bulk Cable Part number: F083-D_BB Total Cost for 3031 feet: $1,421,95

    45. 45 Fiber Connectors Labor costs of installation MicroWarehouse 3M Hot Melt SC Fiber Connector Part number: DCO2209 Cost: $11.99 Total cost: $120.00

    46. 46

    47. 47

    48. 48

    49. 49

    50. 50

    51. 51 Useful objects??

    52. 52

    53. 53

    54. 54 Summary TCS Project Requirements for Washington School District supporting the CORE Specific requirements for Data Center Specific requirements for Sunnyslope Connection to WAN Frame relay Double firewall Connections in LAN VLAN Administrative Curriculum Other security issues Protocols Access Control lists Physical placement of networking devices

More Related