Re-Co WP3: Common Re-Co process and Pilot Project Documentation

Re-Co WP3: Common Re-Co process and Pilot Project Documentation D3.3 Re-Co pilot project process scheme energydesign braunschweig GmbH (project partner) Stefan Plesser, Adrian Görtgens. Re-Co WP 3: Common Re-Co Process and Pilot Project Documentation This document

linus
Download Presentation

Re-Co WP3: Common Re-Co process and Pilot Project Documentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Re-Co WP3: Common Re-Co process and Pilot Project Documentation D3.3 Re-Co pilot project process scheme energydesignbraunschweig GmbH (project partner) Stefan Plesser, Adrian Görtgens

  2. Re-Co WP 3: • Common Re-Co Process and Pilot Project Documentation • This document • Shows some example approaches for Re-Co • Defines a Re-Co process for this project • Gives practical re-commendations for the current tasks in the pilots • Provides examples for elements of Re-Co projects

  3. D3.3 Re-Co pilot project process scheme • Re-Commended Literature and examples (to be put on MOSS) • L1: ISO 50001 (International) • Content: • Energy Management in Companies / Administrations • Reference to PDCA-Cycle • Focus on Administration and Management within the Institution, less information on how to actually do something • Re-Co: • Should somehow refer to this in an “official” way • Should be more practical and less focused on Administr. • We need to understand the difference between engineering and management concepts! • L2: Continuous Commissioning Guidebook (USA) • Content: • Guidebook with analysis/contract/implementation phases, Focus on external approach • Focus on technical issues (HVAC), Energy, IEQ, Cost • ReCo: • Should not focus on contract issues • Should not only focus on Technology and O&M personnel P A D C • Source: ISO 50001

  4. D3.3 Re-Co pilot project process scheme • Re-Commended Literature and examples (to be put on MOSS) • L3: Recommissioning Guide for Building Owners and Managers (Canada) • Content: • Some background on ReCo • 6 steps from Pre-Study to Monitoring, helpful for internal and external use • Focus on technical issues (HVAC), Energy, IEQ, Cost • Good Checklist to start (“key strategies”) • ReCo: • Should include (all kinds of) occupants • Has to skip pre-screening to select buildings? • L4: California Commissioning Guide: Existing Buildings (USA) • Content: • Similar to above, more compact • Interfaces to LEED • Also: L5: IPMVP, L6: Reports of IEA Annex 40 and 47 P D C A Source: Recommissioning Guidebook, Canmet, 2008

  5. D3.3 Re-Co pilot project process scheme • Getting started in Re-Co: Process Template • Process design with focus on pilot status (1.+2.) • Design (Plan) • Clarification of basics and objectives • Pre-Analysis and selection of buildings • Establishing of baseline • Investigation (Plan) • Analysis of buildings • Pre-Design of Measures • Implementation (Do) • (Hand-off) Evaluation (Check) • Continuity (Act) Recommendations to pilots • 1.1 should be the focus of the pilots at this stage. • 1.2 may not be an option in this project: check if the chosen buildings would have been selected for ReCo.If you can still choose buildings: select the ones with some clear (technical) potentials! • Do not spend to much time on formalities at this point. • ReCo should start pilot logs for each pilot, this could be identical with our informal report for EACI to document what we have done. Plan Do Check Act

  6. D3.3 Re-Co pilot project process scheme Getting started in Re-Co: 1. Design

  7. D3.3 Re-Co pilot project process scheme Getting started in Re-Co: 1. Design 1.1 Clarification of basics and objectives

  8. D3.3 Re-Co pilot project process scheme • Getting started in Re-Co: 1. Design • 1.2 Pre-Analysis and selection of buildings

  9. D3.3 Re-Co pilot project process scheme • Getting started in Re-Co: 1. Design • 1.3 Establishing of baseline

  10. D3.3 Re-Co pilot project process scheme Getting started in Re-Co: 2. Investigation

  11. D3.3 Re-Co pilot project process scheme • Getting started in Re-Co: 2. Investigation • 2.1 Analysis of Building

  12. D3.3 Re-Co pilot project process scheme • Getting started in Re-Co: 2. Investigation • 2.2 Pre-Design of Measures • Getting started in Re-Co: 2. Investigation • 2.3 Verify the Pre-Design

  13. D3.3 Re-Co pilot project process scheme • Getting started in Re-Co: 2. Investigation • 2.3 Verify the pre-design

  14. D3.3 Re-Co pilot project process scheme Getting started in Re-Co: 3. Implementation

  15. D3.3 Re-Co pilot project process scheme • Getting started in Re-Co: 3. Implementation • 3.1 Design measures and implementation

  16. D3.3 Re-Co pilot project process scheme • Getting started in Re-Co: 3. Implementation • 3.1 Design measures and implementation

  17. D3.3 Re-Co pilot project process scheme • Getting started in Re-Co: 3. Implementation • 3.2 Implementation

  18. D3.3 Re-Co pilot project process scheme • Getting started in Re-Co: 3. Implementation • 3.3 Documentation

  19. D3.3 Re-Co pilot project process scheme Getting started in Re-Co: 4. Hand-Off / Evaluation (Check)

  20. D3.3 Re-Co pilot project process scheme Getting started in Re-Co: 4. Hand-Off / Evaluation (Check)

  21. D3.3 Re-Co pilot project process scheme Getting started in Re-Co: 4. Hand-Off / Evaluation (Check)

  22. D3.3 Re-Co pilot project process scheme Getting started in Re-Co: 5. Continuity (Act)

  23. D3.3 Re-Co pilot project process scheme Getting started in Re-Co: 5. Continuity (Act)

  24. D3.4 Re-Co pilot project documentation template (PilotLog) Milestones The following milestones should be defined an documented in all pilot projects and for all measures.