40 likes | 54 Views
Commercial Roll Line Shrink Reduction P09712. Levi Stuck Evan DeCotis Cinthia Sanchez Joseph Fitzery Ryan Dennison. Customer Needs. Specifications. Deliverables. Costumer Needs Assessment (Final) Specifications (Preliminary) One page project summary (Final) WBS and team roles (Final)
E N D
Commercial Roll Line Shrink Reduction P09712 Levi Stuck Evan DeCotis Cinthia Sanchez Joseph Fitzery Ryan Dennison
Deliverables Costumer Needs Assessment (Final) Specifications (Preliminary) One page project summary (Final) WBS and team roles (Final) 2 – quarter schedule (Final) Three week plan (Final) Benchmarking