1 / 3

Tony Flavin

Timing and Synchronisation Current Organisation – 6 FTE . Tony Flavin. T&SD– 1 FTE. T&SD– 1FTE. T&SD– 1 FTE. T&SD– 1 FTE. DFTS Test– 1 FTE. T&SD– 1 FTE. T&SD – Timing and Sync Design. DFTS Test – Timing and Sync test for DFTS/Lab Manager.

locke
Download Presentation

Tony Flavin

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Timing and Synchronisation Current Organisation – 6 FTE Tony Flavin T&SD– 1FTE T&SD– 1FTE T&SD– 1FTE T&SD– 1FTE DFTS Test– 1 FTE T&SD– 1FTE • T&SD – Timing and Sync Design • DFTS Test – Timing and Sync test for DFTS/Lab Manager

  2. Timing and Synchronisation Proposed Organisation – 5 FTE Tony Flavin T&SD– 1FTE T&SD– 1FTE T&SD– 1FTE T&SD– 1FTE T&SD– 1FTE • T&SD – Timing and Sync Design • DFTS lab test stop, Lab Manager Role moved to Monteray

  3. DFTS Test stop, Lab manager absorb • Current role of team is to provide Timing and Synchronisation design plus DFTS test and Lab Management • Current organisation is 6FTE • Proposed role of team is to do Timing and Synch Design but stop DFTS test and use Monteray for Lab Management • Proposed organisation is 5FTE • 1FTE move to BTTC on 3/8/12

More Related