90 likes | 521 Views
PBN Airspace Concept Workshop. Review. INTERNET: pin:. Review of Workshop. 10 day PBN Airspace Design Workshop ICAO Doc 9992: PBN in Airspace Design Plan, Design, Validate, Implement 17 steps Integration of ICAO Doc 9931 & 9993: CDO and CCO
E N D
PBN Airspace ConceptWorkshop Review INTERNET: pin:
Review of Workshop • 10 day PBN Airspace Design Workshop • ICAO Doc 9992: PBN in Airspace Design • Plan, Design, Validate, Implement • 17 steps • Integration of ICAO Doc 9931 & 9993: CDO and CCO • ICAO Circ 330: Civil / Miitary Cooperation in ATM • Designed routes and airspace in TMA • “Centerville”: Civil / Military: Conditional Routes - CDR 1, 2, 3 • Routes designed for dual airports • Phuket / Krabi • Enroute design and multi-TMA integration practice • Southeast Asia
Questions Asked PATH TERMINATOR CODING RULES REF: PANS OPS 8168, VOL2, SECTION III, Appendix to Chapter 5
Questions Asked PATH TERMINATOR CODING RULES REF: PANS OPS 8168, VOL2, SECTION III, Appendix to Chapter 5
Discussion Points • Build it and they will come • Who benefits – keep current or change to new • Mixed mode is a common occurrence today • Ongoing and refresher training • Future improvements • Route spacing • Curved simultaneous approaches to multiple rwys • Implementation challenges
Course Survey Form: http://goo.gl/AyzkhW
Contact Information • Instructors: • morinj@iata.org • Walter.White@AirTraffic.biz • Jeffrey.Williams@Tetratech.com • Survey: http://goo.gl/AyzkhW