An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Board of County Commissioners PUBLIC HEARING November 9, 2010

  2. Board of County Commissioners Project : Tupperware Heights PD/ Tupperware Heights PSP District #: 4 Proposed Use: 3 Commercial/Office/Multi-family (age-restricted): Commercial/Office: 215,883 sq. ft. - Max. building height (Commercial): 50’ - Max. building height (Office): 85’ Multi-family (age-restricted): 958 units - Max. building height: 85 ft./7 stories - Min. living area: 750 sq. ft. -

  3. Board of County Commissioners Tupperware Heights PD/ Tupperware Heights PSP Location Map

  4. Board of County Commissioners Tupperware Heights PD/ Tupperware Heights Preliminary Subdivision Plan

  5. Board of County Commissioners Action Requested • Approve the Tupperware Heights Planned Development/ Tupperware Heights Preliminary Subdivision Plan dated “Received August 18, 2010,” subject to the twelve (12) conditions in the staff report.

  6. Board of County Commissioners DRC Recommendations Development shall conform to the Tupperware Heights Planned Development; Orange County Board of County Commissioners (BCC) approvals; Tupperware Heights Preliminary Subdivision Plan dated "Received August 18, 2010" and to the following conditions of approval. Development based upon this approval shall comply with all applicable federal, state and county laws, ordinances and regulations, which are incorporated herein by reference, except to the extent any applicable county laws, ordinances and regulations are expressly waived or modified by these conditions, or by action approved by the BCC, or by action of the BCC. In the event of a conflict or inconsistency between a condition of approval of this preliminary subdivision plan and the actual preliminary subdivision plan dated "Received August 18, 2010," the condition of approval shall control to the extent of such conflict or inconsistency.

  7. Board of County Commissioners DRC Recommendations Cont’d. 2.This project shall comply with, adhere to, and not deviate from or otherwise conflict with any verbal or written promise or representation made by the applicant (or authorized agent) to the Board of County Commissioners at the public hearing where this development was approved, where such promise or representation, whether oral or written, was relied upon by the Board in approving the development, could have reasonably been expected to have been relied upon by the Board in approving the development, or could have reasonably induced or otherwise influenced the Board to approve the development. For purposes of this condition, a “promise” or “representation” shall be deemed to have been made to the Board by the applicant (or authorized agent) if it was expressly made to the Board at a public hearing where the development was considered or approved.

  8. Board of County Commissioners DRC Recommendations Cont’d. 3.Prior to construction plan approval for each lot, a master stormwater management plan including a drainage study to establish the 100-year flood elevation shall be submitted to the Development Engineering Division for review and approval. 4. The stormwater management system shall be designed to retain the 100-year/24-hour storm event onsite, unless documentation with supporting calculations is submitted, which demonstrates that a positive outfall is available. If the applicant can show the existence of a positive outfall for the subject basin, then the developer shall comply with all applicable state and local stormwater requirements and regulations. An emergency high water relief outfall shall be provided to assure overflow does not cause flooding of surrounding areas. 5. Prior to the issuance of any vertical building permits, the plat of the entire subdivision including all wetlands, wetland buffers and tracts shall be approved on the BCC Consent Agenda.

  9. Board of County Commissioners DRC Recommendations Cont’d. 6. There shall not be any development within Tract A. 7. Unless a Conservation Area Impact (CAI) permit is approved by Orange County consistent with Chapter 15 prior to Construction Plan approval, no conservation area or buffer encroachments shall be permitted. 8. Prior to earthwork or construction, the developer shall provide a copy of the completed National Pollutant Discharge Elimination System (NPDES) Notice of Intent (NOI) form for stormwater discharge from construction activities to the Orange County Environmental Protection Division, NPDES Administrator. The original NOI form shall be sent to the Florida Department of Environmental Protection. 9. Billboards and pole signs shall be prohibited. Ground and fascia signs shall comply with Ch. 31.5.

  10. Board of County Commissioners DRC Recommendations Cont’d. 10. Outdoor sales, storage and display shall be prohibited. 11. Prior to construction plan approval, certification with supporting calculations shall be submitted which states that this project is consistent with the approved Master Utility Plan for this PD. 12. Compliance with the arbor ordinance shall occur with individual development plan. No mass grading shall occur without an approved development plan.

  11. Board of County Commissioners Project : Hampden Dubose Academy PD - Ewell Country Estates PSP District #: 2

  12. Board of County Commissioners Action Requested • This item has been continued

  13. Board of County Commissioners Project : College Suites at Woodbury PD - College Suites at Woodbury DP (Green Project) District #: 5 Proposed Use: Student Housing: 211 units/749 beds Parking Garage: 228,200 square feet - Max. building height: 100 ft./8 stories

  14. Board of County Commissioners College Suites at Woodbury PD/ College Suites at Woodbury DP Location Map

  15. Board of County Commissioners College Suites at Woodbury PD/ College Suites at Woodbury Development Plan

  16. Board of County Commissioners Action Requested • Approve College Suites at Woodbury Planned Development - College Suites at Woodbury Development Plan (Green Project) dated “Received August 31, 2010,” subject to the ten (10) conditions in the staff report.

  17. Board of County Commissioners DRC Recommendations Development shall conform to the College Suites at Woodbury Planned Development; Orange County Board of County Commissioners (BCC) approvals; College Suites at Woodbury Development Plan dated "Received August 31, 2010;" and to the following conditions of approval. Development based upon this approval shall comply with all applicable federal, state, and county laws, ordinances and regulations, which are incorporated herein by reference, except to the extent any applicable county laws, ordinances, and regulations are expressly waived or modified by these conditions, or by action approved by the BCC, or by action of the BCC.

  18. Board of County Commissioners DRC Recommendations Cont’d. 2. This project shall comply with, adhere to, and not deviate from or otherwise conflict with any verbal or written promise or representation made by the applicant (or authorized agent) to the Board of County Commissioners at the public hearing where this development was approved, where such promise or representation, whether oral or written, was relied upon by the Board in approving the development, could have reasonably been expected to have been relied upon by the Board in approving the development, or could have reasonably induced or otherwise influenced the Board to approve the development. For purposes of this condition, a “promise” or “representation” shall be deemed to have been made to the Board by the applicant (or authorized agent) if it was expressly made to the Board at a public hearing where the development was considered or approved. 3. Prior to the issuance of any vertical building permits, the plat shall be approved on the BCC Consent Agenda. 4. Prior to construction plan approval, documentation must be provided that this project has the legal right to discharge as presented on the plan.

  19. Board of County Commissioners DRC Recommendations Cont’d. 5. Prior to earthwork or construction, the developer shall provide a copy of the completed National Pollutant Discharge Elimination System (NPDES) Notice of Intent (NOI) form for stormwater discharge from construction activities to the Orange County Environmental Protection Division, NPDES Administrator. The original NOI form shall be sent to the Florida Department of Environmental Protection. 6. Unless a Conservation Area Impact (CAI) permit is approved by Orange County consistent with Chapter 15 prior to Construction Plan approval, no conservation area or buffer encroachments shall be permitted. 7. Approval of this DP shall void previously approved DP. 8. Billboards and pole signs shall be prohibited. All signage shall comply with Ch. 31.5. The ancillary commercial is not entitled to any signage. 9. Outdoor sales storage and display shall be prohibited.

  20. Board of County Commissioners DRC Recommendations Cont’d. 10. No permanent school-aged children shall be generated as a result of any development on this Development Plan. Any proposal to add permanent school-aged children will be deemed a substantial change and shall require BCC approval.

  21. Board of County Commissioners PUBLIC HEARING

  22. Board of County Commissioners PUBLIC HEARING November 9, 2010

  23. Board of County Commissioners Project : The Quadrangle (Tract 24) PD - MHUS Student Housing DP District #: 5 Proposed Use: Student Housing and/or: 2063 beds Senior Housing and/or Multi-family: 602 units Commercial: 134,312 sq. ft. - Max. building height: 120 ft./10 stories

  24. Board of County Commissioners The Quadrangle (Tract 24) PD/ MHUS Student Housing DP Location Map

  25. Board of County Commissioners The Quadrangle (Tract 24) PD/ MHUS Student Housing Development Plan

  26. Board of County Commissioners Action Requested • Approve The Quadrangle (Tract 24) Planned Development – MHUS Student Housing Development Plan dated “Received August 27, 2010,” subject to the eleven (11) conditions in the staff report.

  27. Board of County Commissioners DRC Recommendations Development shall conform to The Quadrangle (Tract 24) Planned Development; Orange County Board of County Commissioners (BCC) approvals; MHUS Student Housing Development Plan dated “Received August 27, 2010”; and to the following conditions of approval. Development based upon this approval shall comply with all applicable federal, state and county laws, ordinances and regulations, which are incorporated herein by reference, except to the extent any applicable county laws, ordinances and regulations are expressly waived or modified by these conditions, or by action approved by the BCC, or by action of the BCC.

  28. Board of County Commissioners DRC Recommendations Cont’d. 2. This project shall comply with, adhere to, and not deviate from or otherwise conflict with any verbal or written promise or representation made by the applicant (or authorized agent) to the Board of County Commissioners at the public hearing where this development was approved, where such promise or representation, whether oral or written, was relied upon by the Board in approving the development, could have reasonably been expected to have been relied upon by the Board in approving the development, or could have reasonably induced or otherwise influenced the Board to approve the development. For purposes of this condition, a “promise” or “representation” shall be deemed to have been made to the Board by the applicant (or authorized agent) if it was expressly made to the Board at a public hearing where the development was considered or approved. 3. Prior to construction plan approval, certification with supporting calculations shall be submitted which states that this project is consistent with approved master stormwater and utility plans for this Planned Development.

  29. Board of County Commissioners DRC Recommendations Cont’d. • 4. Prior to construction plan approval, documentation must be provided that this project has the legal right to tie into the master drainage system. • 5. Signalization, median crossings and access management along Alafaya Trail shall be permitted through FDOT. • 6. Prior to earthwork or construction, the developer shall provide a copy of the completed National Pollutant Discharge Elimination System (NPDES) Notice of Intent (NOI) form for stormwater discharge from construction activities to the Orange County Environmental Protection Division, NPDES Administrator. The original NOI form shall be sent to the Florida Department of Environmental Protection. • 7. Billboards and pole signs shall be prohibited. Ground and fascia signs shall comply with Ch. 31.5. • Outdoor sales, storage, and display shall be prohibited.

  30. Board of County Commissioners DRC Recommendations Cont’d. 9. Approval of this Development Plan shall constitute lot split approval asdepicted in Exhibit A100.1, entitled “Lot Split Exhibit,” included herein as Exhibit A. Any reconfiguration of that site plan may constitute a substantial change and be subject to additional County review. 10. Prior to construction plan approval, a revised landscaping plan shall be submitted to Orange County for review and approval. 11. No permanent school-aged children shall be generated as a result of any development on this Development Plan. Any proposal to add permanent school-aged children will be deemed a substantial change and shall require BCC approval.

  31. Board of County Commissioners Project : Winegard Road South PD/ Winegard Road South PSP District #: 4 Proposed Use: 6 Commercial/P-O/Industrial lots: Commercial: 175,000 sq. ft. - Max. building height: 50’ Professional Office: 35,000 sq. ft. - Max. building height: 35’ Industrial (I-2/I-3): 950,000 sq. ft. - Max. building height: 50’ Industrial (I-1A): 650,000 sq. ft. - Max. building height: 50’

  32. Board of County Commissioners Winegard Road South PD/ Winegard Road PSP Location Map

  33. Board of County Commissioners Winegard Road South PD/ Winegard Road Preliminary Subdivision Plan

  34. Board of County Commissioners Action Requested • Approve the Winegard Road South Planned Development Winegard Road Preliminary Subdivision Plan dated “Received August 30, 2010,” subject to the nine (9) conditions in the staff report.

  35. Board of County Commissioners DRC Recommendations Development shall conform to the Winegard Road South Planned Development; Orange County Board of County Commissioners (BCC) approvals; Winegard Road South Preliminary Subdivision Plan dated "Received August 30, 2010" and to the following conditions of approval. Development based upon this approval shall comply with all applicable federal, state and county laws, ordinances and regulations, which are incorporated herein by reference, except to the extent any applicable county laws, ordinances and regulations are expressly waived or modified by these conditions, or by action approved by the BCC, or by action of the BCC. In the event of a conflict or inconsistency between a condition of approval of this preliminary subdivision plan and the actual preliminary subdivision plan dated "Received August 30, 2010” the condition of approval shall control to the extent of such conflict or inconsistency.

  36. Board of County Commissioners DRC Recommendations Cont’d. 2.This project shall comply with, adhere to, and not deviate from or otherwise conflict with any verbal or written promise or representation made by the applicant (or authorized agent) to the Board of County Commissioners at the public hearing where this development was approved, where such promise or representation, whether oral or written, was relied upon by the Board in approving the development, could have reasonably been expected to have been relied upon by the Board in approving the development, or could have reasonably induced or otherwise influenced the Board to approve the development. For purposes of this condition, a "promise" or "representation" shall be deemed to have been made to the Board by the applicant (or authorized agent) if it was expressly made to the Board at a public hearing where the development was considered or approved.

  37. Board of County Commissioners DRC Recommendations Cont’d. 3.Prior to construction plan approval, a master stormwater management plan including a drainage study to establish the 100-year flood elevation shall be submitted to the Development Engineering Division for review and approval. (DE) 4. The stormwater management system shall be designed to retain the 100-year/24-hour storm event onsite, unless documentation with supporting calculations is submitted, which demonstrates that a positive outfall is available. If the applicant can show the existence of a positive outfall for the subject basin, then the developer shall comply with all applicable state and local stormwater requirements and regulations. An emergency high water relief outfall shall be provided to assure overflow does not cause flooding of surrounding areas. (DE) 5. Prior to earthwork or construction, the developer shall provide a copy of the completed National Pollutant Discharge Elimination System (NPDES) Notice of Intent (NOI) form for stormwater discharge from construction activities to the Orange County Environmental Protection Division, NPDES Administrator. The original NOI form shall be sent to the Florida Department of Environmental Protection. (EPD)

  38. Board of County Commissioners DRC Recommendations Cont’d. 6. Unless a Conservation Area Impact (CAI) permit is approved by Orange County consistent with Chapter 15 prior to Construction Plan approval, no conservation area or buffer encroachments shall be permitted. (EPD) 7. A Master Utility Plan (MUP) shall be submitted to Orange County Utilities prior to approval of the first development plan and the MUP shall be approved prior to construction plan approval. 8. Pole signs and new billboards shall be prohibited. Ground and fascia signs shall comply with Ch. 31.5. Existing billboards shall be removed at the end of the current leases. No extensions of the current leases shall be permitted beyond July 2013. 9. Outdoor sales, storage, and display shall be prohibited in those areas designated Commercial, Office, and/or I-1A uses.

  39. Board of County Commissioners PUBLIC HEARING