1 / 80

Cost-Benefits Analysis in SHM Projects Opening Keynote at SHMII-5

Cost-Benefits Analysis in SHM Projects Opening Keynote at SHMII-5. Daniele Inaudi. Is SHM about Monitoring Bridges?. Is SHM about Insuring Safety of Dams?. Is SHM about reducing Risk in Excavations?. Is SHM about Avoiding Leakages in Pipelines?. Is SHM about Adding Prestige to a Building?.

loring
Download Presentation

Cost-Benefits Analysis in SHM Projects Opening Keynote at SHMII-5

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cost-Benefits Analysis in SHM ProjectsOpening Keynote at SHMII-5 Daniele Inaudi

  2. Is SHM about Monitoring Bridges?

  3. Is SHM about Insuring Safety of Dams?

  4. Is SHM about reducing Risk in Excavations?

  5. Is SHM about AvoidingLeakages in Pipelines?

  6. Is SHM about Adding Prestige to a Building?

  7. Is SHM about Preserving Natural Resources?

  8. Is SHM about Enabling Remote Management?

  9. SHM is about all of this and more…

  10. SHM has evolved from being a research topic…

  11. …to being an Industry

  12. An « Industry » is a meeting place between Supply and Demand…

  13. … between Cost and Perceived Benefits

  14. This presentation is about defining Cost and Benefits from a Customer-Supplier Relationship Perspective

  15. WARNING: This presentation has no sophisticated financial models or a universal recipe for commercial success…

  16. … just some personal observations derived from practice

  17. Defining Cost Capital Investment + Operational Costs

  18. Cost: Capital Investment SHM design costs, including: Integration with the structure’s design Planning and project management

  19. Cost: Capital Investment Hardware costs: Sensors Cables Data acquisition and management hardware Communication

  20. Cost: Capital Investment Installation costs: Integration with building schedule Configuration Commissioning Reporting

  21. OperationalCosts System maintenance Spare parts and consumables Energy Communication

  22. OperationalCosts Data Management Publishing Archiving

  23. OperationalCosts Data analysis Interpretation Reporting

  24. Total Costs Typically 0.5 – 3% of new construction costs Hardware cost typically less than 50% of total cost Total Investment+ recurring costs are important for the owner

  25. Identifying Benefits

  26. Hard Benefits vs. Soft Benefits

  27. Capital Value Hard(ly) Benefit

  28. Reduction of Risk (hard and soft benefit)

  29. Approx. cost: 800’000€ Benefits: Risk Reduction: insurance Crack Detection in Tunnel

  30. Increase Safety (hard and soft benefit)

  31. Approx. cost: 400’000$ Benefits: Risk Reduction: insurance, safety of rail Sinkhole detection and localization

  32. Increase Quality (hard and soft benefit)

  33. Approx. cost: 25’000$ /building Benefits: Quality control, image Building Monitoring

  34. Discover Structural Reserves (hard benefit)

  35. Approx. cost: 250’000$ Benefits: Avoid strengthening Loads on Arena roof

  36. Worst-case scenario

  37. Strain limit: 900µε

  38. Early detection of defects (hard benefit)

  39. Approx. cost: 150’000€ Benefits: verify design, no defects Bridge enlargement

  40. Strain limit: 900µε

  41. Safe Lifetime Extension (hard benefit)

More Related