INGAA Direct Assessment Industry Workgroups. Drew Hevle El Paso Corporation. Overview. External Corrosion Direct Assessment workgroup Sponsored by INGAA Many other participating organizations Validation efforts – PRCI, NGA, PG&E, AGA/GTI. Overview. Other workgroups
E N D
INGAA Direct Assessment Industry Workgroups Drew Hevle El Paso Corporation
Overview • External Corrosion Direct Assessment workgroup • Sponsored by INGAA • Many other participating organizations • Validation efforts – PRCI, NGA, PG&E, AGA/GTI
Overview • Other workgroups • Internal corrosion direct assessment • SCC direct assessment
Goals of workgroups • Provide forum for participation for operators, contractors, and regulators • Distribute information • Coordinate research and validation efforts • Identify gaps
Goals of workgroups • Discuss and propose new research • Provide input to standards and regulatory development • Develop and distribute protocols • Identify new technologies and applications
ECDA Workgroup • ECDA workgroup headed by Drew Hevle of El Paso • Latest meeting September 26 in Houston • Conference calls being held bi-weekly • Next meeting December 18 in Houston
ECDA Workgroup Makeup • ECDA distribution list includes approximately 125 members • 60 operators (includes gathering, transmission and distribution) • 50 contractors/industry organizations • 15 regulators (both state and federal) • Some participants from outside the natural gas industry, some international, not all interest strictly in Title 49 changes • Similar distribution for ICDA workgroup
ECDA Workgroup • Status • PRCI validation project updates from nine of the participating companies • Development of an ECDA Guidebook to aid in converting the NACE standard RP 0502 into procedures and specifications
ECDA Workgroup • Status • Update on NGA’s validation effort • Soils model update • Opportunities for site visits
PRCI High-Impact Program • Co-funded by DOT, managed by Fred Joyner • Programs • External Corrosion Direct Assessment • Review of 2000/2001 data • ECDA validation project • Reliability-based risk assessment • Soils model • ECDA Manual • Others
PRCI High-Impact Program • Companies were requested to volunteer pipeline segments that had been in-line inspected recently • Most pipelines were large diameter coated transmission gas pipelines • Protocol developed to apply NACE 0502 in a consistent manner
PRCI High-Impact Program • Consultants provided to conduct the indirect inspections and direct examinations in a consistent manner • Additional tools evaluated, such as EUPEC RMS Delta survey, soils model, Miller DA meter, additional direct examinations made
PRCI High-Impact Program • Participating companies • CenterPoint Energy • Duke Energy/Union & Texas Eastern • El Paso/Tennessee Gas • Enbridge/Consumers • Gulf South (2 segments) • Panhandle (2 segments) • SoCal (3 segments) • Williams
PRCI High-Impact Program • Results • Goal to complete direct examinations by Thanksgiving • Periodic updates at ECDA workgroup meetings and conference calls • PRCI will generate a final report available in 2004
ECDA Workgroup • Gaps identified • Identify the limits of the NACE standard • Shielding coating • Rocky backfill • Adjacent metallic structures
ECDA Workgroup • Gaps identified • Confirmatory direct assessment • PRCI project conducted with ILI and ECDA results • Would be relatively simple to take this existing data and evaluate for effectiveness with CDA
ECDA Workgroup • Gaps identified • New methods for calculating reassessment intervals • Better and more efficient indirect assessment tools for bare and poorly coated pipelines
ECDA Workgroup • Gaps identified • Need for consistency in application • Need for standards for indirect inspections • Issues with telluric currents and new inspection techniques
ICDA Workgroup • ICDA headed by Garry Matocha of Duke Energy • Latest meeting October 20, 2003 • Next meeting scheduled for January 2004
ICDA Workgroup • Status • NACE RP for ICDA (Dry Gas Systems) expected to go out for ballot this week • Short uninspectable segments are portions of the systems which will be difficult to evaluate. Additional work in this area is needed.
ICDA Workgroup • Status • The CDA work group requested input regarding CDA procedures for internal corrosion. This is currently under development by a smaller group which will circulate the proposed procedures to the larger work group for comment prior to the next meeting.
SCCDA Workgroup • SCCDA standard is still in the development stage • NACE TG 273 is developing the standard • Chair John Beavers, vice-chair Jim Marr • Preliminary draft discussed at NACE Corrosion Technology Week in September in Pittsburgh • No formal workgroup has been created yet
Participation • If you would like to participate in any of these groups, please contact • ECDA – Drew Hevle • drew.hevle@elpaso.com • ICDA – Garry Matocha • gmmatocha@duke-energy.com