290 likes | 303 Views
This report provides the current status of action items, technical baselines, interface control documentation, and risk management for the GLAST Large Area Telescope system engineering. It also includes updates on deliverables, verification status, key design metrics, and risk management activities.
E N D
Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering
Topics • Action Item Status • Technical Baseline Management • Issues • Interface Control Documentation • RFA Closure • Key Metrics • Risk Management
Interface Document Status • SC-LAT ICD ICN Status • LAT signed this month • None • Currently under signature review • None • Currently in draft or revision • ICN-087 LAT Deliveries Table • ICN-095 Grid Hole Position • Spectrum reviewing draft • ICN-097 MLI Interface • Spectrum reviewing draft • Internal LAT ICD’s • Signed off this month • None • Currently in signature review • None • Currently in update • Electronics-LAT ICD (Comments being incorporated as they are received)
Deliverables/Receivables • LAT Deliverables • Aug: None Scheduled • Sept: Return SC Interface Tool to SASS • Oct: None Scheduled • Nov: None Scheduled • LAT Receivables • Aug: None Scheduled • Sept: None Scheduled • Oct: None Scheduled • Nov: None Scheduled
LAT Level Verification Status • Primary requirement verification effort has been the generation of Verification Plans. • Issues regarding flow-down of requirements continue to be worked. • NASA review of VCRM resulted in 4 Draft Verification Plan requirements were moved from Demonstration to Test. • Progress since last month • Requirements Identified : No Additional Requirements • Flow Down Complete : No Additional Requirements • Draft Verification : Additional 2 Requirements • Final Verification: No Additional Requirements • Verification Plan Executed : No Additional Requirements • Requirement Sold: No Additional Requirements
Mass and Power Status Summary • Mass • No change • Power • LAT Power Consumption Estimate has decreased by 0.1 W • A margin of 10.4% exists to LAT Power Allocation with 76% of the Estimated Power measured. • FSW estimates updated • No change
LAT Power Status LAT Power Consumption Estimate has decreased by 0.1 W. • TKR Estimate decrease by 0.2 W based on average of measured modules. • CAL Estimate increase by 0.1 W based on measured average of all modules. • T&DF Estimate decrease by 0.1W based on 8 Tower measured data.
Measured LAT Power • 1. Tower measurements for bays 0,1,4,5,8,9,12,13 are consistent and supported by predicts
Survival Power LAT Power Status (Continued)
FSW Resource Usage Current Estimates * Storing multiple copies (4 currently to use available memory) for risk mitigation
Instrument Bandwidth Resources • LAT communication, bandwidth (BW) in Mbyte/sec * Present performance of event filter for EPU-CPU, still being optimized. Eventually the physics filter will be adjusted/loosened to take advantage of the max average bandwidh EBM: Event-Builder Module EPU: Event-Processing Unit SIU: Spacecraft Interface Unit
Risk Management Activity • Reduced ASIC qualification risk from moderate to low • Reduced TPS qualification risk from moderate to low
Cost Variance Explanation • Why overrun/underrun? • On plan • What will be done to correct? • None needed
FTE Variance Explanation • Why overrun/underrun? • On plan • What is the impact? • None • What will be done to correct? • No correction required