An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CSC Trigger Darin Acosta University of Florida Also representing UCLA and Rice University

  2. CSC Muon Trigger Scheme EMU TriDAS On-Chamber Trigger Primitives Muon Port Card(Rice) 3-D Track-Finding and Measurement Trigger Motherboard(UCLA) Strip FE cards Sector Receiver/ Processor(U. Florida) LCT OPTICAL FE SP SR/SP MPC LCT TMB 3 / port card FE 2 / chamber 3 / sector Wire LCT card TF crate(1) Wire FE cards Peripheral crates (60) RAT CSC Muon Sorter(Rice) RPC-ALCT Transition card RPC DT 4 4 4 Global L1 Global  Trigger 4

  3. CSC Trigger Primitives Local Charged Track (LCT) logicidentifies track stubs in CSCs Cathode strips • Cathode strips: precise f-coordinate (bending direction) determination in each layer by interpolation of induced strip charges. • Anode wire groups: precise timingfor bunch crossing tagging and radial position determination.

  4. Muon Track-Finding • Link trigger primitives into 3D tracks • Measure pT, , and  in non-uniform fringe field • Send highest qualitycandidates to Global Trigger • Partitioned into 60° sectors that align with DT chambers  

  5. Trigger Motherboard Production Status • TMB board layout was re-done: • Solves noise problems (tested) • Prototypes (2) were recently produced • Preproduction of ~30 boards started • All parts are in hand, except for some machined panels (not a problem) • Requires re-design of peripheral crate backplane (done, in test) • Mezzanine (XC2V4000) cards: • 220 cards in hand • Only about 5 have problems • Another 120 being assembled this month EMU project, UCLA

  6. Muon Port Card TriDAS, Rice Univ. VME Interface (glue logic) To Track-Finder GTLP Receivers Sorting logic:18  3 LCTs TLK2501 serializers Optomodules Mezzanine card

  7. Muon Port Card Production Status • 75 production boards have been assembled and checked at Rice (60 used in system) • 70 boards are equipped with mezzanine FPGA • 47 boards passed a burn-in test at OSU and re-tested at Rice  Onefailed the chain-test  Will bake the other boards soon

  8. Chain Test of the MPC with TMB All prototype, preproduction, and production boards have been required to pass a set of thorough chain tests. • Load random patterns into 9 TMBs • Send them out simultaneously from all TMBs at 80Mhz • Check data from FIFO_B at MPC (results of sorting) • Check feedback “winner” bits from TMBs • Check data from input FIFO at SP after optical transmission • Measure “safe window” of data latching from nine TMBs

  9. CSC Track-Finder Crate Single crate system, in production now Clock & Control Board Sector Processor SR SR SR SR SR SR SR SR SR SR SR SR CCB MS / / / / / / / / / / / / SP SP SP SP SP SP SP SP SP SP SP SP CAEN VME Controller From MPC (chamber 4) Muon Sorter From MPC (chamber 3) From MPC (chamber 2) From MPC (chamber 1B) From MPC (chamber 1A) To DAQ Interfaces: 180 optical links from 60 EMU peripheral crates (3 fibers/crate from MPC) 72 SCSI cables to/from DTTF crates

  10. Sector Processor Production Board Florida Phi Global LUT Eta Global LUT Phi Local LUT Front FPGA TLK2501 Transceiver • Optical Transceivers • 15 x 1.6 Gbit/s Links TF logic mezz card

  11. SP Production and Test Status • The previous Sector Processor prototype, SP02, has been fully validated and used as a trigger for CSC beam tests in 2003-2004 • 3 boards exist, all in use: one at CERN (for Slice Test) and rest at Florida and Rice (for MPC and SP production tests) • The production version, SP04, is fully compatible with SP02 • Significant delay and problems occurred with initial vendor • ~4 month total delay due to poor assembly by initial vendor • Same vendor as for SP02 prototype! • After significant re-working by other companies, first two production boards pass single board validation checks • Second vendor was selected to complete SP production • First 2 assembled boards (3rd and 4th in production) have been received and are under test • One board passes all single board tests including optical loop-back and full SP functionality check (3000 iterations of 255 BX of random data input) • Will perform chain test with MPC and MS before launching rest of production (17 more modules)

  12. SP/MS Mezzanine Card Status • Contains Track-Finding algorithm • Same mezzanine card is used for Muon Sorter • The previous (2002) prototype was fully validated • Production version of mezzanine card fully compatible with prototype • Production is nearly complete • Despite some initial problems with connector assembly, 14 new mezzanine cards have been fully validated (+5 old) • 2 others show some discrepancies and are under investigation

  13. Muon Sorter Rice Univ. VME/JTAG INTERFACE MEZZANINE CARD LVDS DRIVERS AND SCSI-3 CONNECTORS GTLP BACKPLANE INTERFACE From SP’s Sorting logic: 36  4 tracks, output to GMT, 1 needed

  14. MS Tester Board (SP emulator) • We would like to test the MS with a full crate of SP’s • Since all there is in the final system is one crate of SPs, it is not practical to wait for the SPs • Instead, we built a simple board for injecting trigger patterns • We can fill the crate with these and perform chain-test with the MS

  15. TF Chain Test Results • Full TF crate tests with SP emulator boards shows some problems with grounding • Solution found and tested. • Muon Sorter and TF backplane are under redesign New ground planes and new signal routing will be implemented on TF backplane (Florida)

  16. Muon Sorter to Global Muon Trigger Test • Muon Sorter – Global Muon Trigger Test was successfully conducted in January • There was a VME access error when TTC used to clock system, but cannot reproduce at Rice

  17. Schedule • SP • Assuming no unexpected problems, foresee final 16-board production to start in July • Board testing should be complete by end of September • MS • Re-design and fabrication complete by end of September • TF backplane • Backplane redesigned. Fabrication complete end of July • Ready for fully-loaded TF crate tests by October • Testing with Muon Sorter and TF backplane at Rice University in U.S. • 2 months, with old and new versions of MS and BP • Fully validated TF crate by end of 2005

  18. Milestones – Summary of Previous

  19. Plans for Commissioning at Bat. 904 • Integration tests with CSC trigger production electronics (i.e. full-crate tests of Track-Finder electronics and peripheral crate electronics) are taking place in the U.S. • Tests will be repeated at Bat.904 when boards are shipped to CERN later this year • Expect to make use of Bat.904 also for integration tests with other subsystems • In particular, further CSC TF  DT TF integration tests to work on synchronization procedures, combined Track-Finding, and software integration • Currently we have one complete CSC TF setup @ CERN (SP2002 prototype), currently occupied with CSC Slice Tests at SX5

  20. ME4 DT-11 DT-10 ME3 ME2 ME1 CSC Slice Tests & Cosmic Challenge • Incremental steps to a complete slice test during the CMS Cosmic Challenge • Work began in earnest at SX5 inmid-April • Currently connected 6 chambers in ME+2 and ME+3, forming a 20° slice on YE+2 that is part of the trigger sector planned for the Cosmic Challenge • CSC Track-Finder will provide a cosmic muon trigger based on a coincidence of LCTs in two or more disks

  21. Track Finder Crate @ SX5 • Currently set-up as we operated during the 2004 beam tests • Except no scintillator trigger available! • Developing procedures and software to test the system and to time-in and synchronize the CSC trigger with no other external inputs SP

  22. CSC Trigger “Boot-Strap” Procedures Detailed procedures being developed on how to time-in and bring to operation the CSC trigger at CMS using injected data and no other external triggers: • Board validation checks • Test distribution of L1Request from SP to TTC tree • MPC to SP optical link synchronization procedure • MPC to SP PRBS test • MPC to SP Spy FIFO Test • Synchronization of SP Pipeline FIFO (for SP DAQ) • Synchronization of received TMB LCTs (chamber data!) using single chamber trigger • Two-station coincidence cosmic trigger implemented

  23. Run-control and Quality Control Software • As part of the testbeam and Slicetest programs, online control software using XDAQ and HAL has been in development • During 2004 testbeams, a CMS prototype Run Control program was used to configure the Peripheral Crates, Track-Finder crate, TTC and FED crates using XDAQ • For production QC, HAL-based software is used to test all board functionality and to perform trigger chain tests • e.g. many iterations of random input data are injected, and the board output is compared with an exact emulator • Caught some grounding issues with full TF crate test • For Data Quality Monitoring, a sophisticated framework based on the CDF DQM is used by the EMU group • Was used to monitor trigger boards in the peripheral crates during testbeams (continuing to Slicetest)

  24. Simulation Software (for PTDR) • Fairly accurate simulation of the CSC trigger chain is in ORCA • For the SP, a direct translation of the Verilog firmware is implemented, which yields exact agreement with testbeam data • Other boards have approximate functional simulation, but not necessarily exactly bit-for-bit simulation • Some details need updating to latest production board designs and firmware • Further optimization and improvements could still be done: • Muon PT and charge assignment • Tuning of LCT patterns for best efficiency vs. background rejection • BX assignment

  25. Reference Material

  26. Muon Trigger Geometry Initial coverage of RPC is staged to <1.6 Initial coverage of CSC 1st station is staged to <2.1

  27. . . . . . . . . . . . . . . cathode strips 3 - 16 mm avalanche wires Cathode plane wires cathode plane cathode strips avalanche 3.1 mm muon 9.5 mm Cathode Strip Chambers • 6-layer chambers • Radial, trapezoidal cathode strips • Azimuthal anode wires • Induced charges on strips - precise f coordinate • Closely spaced wires - fast timing • Wires ganged in groups of 5 -16 for r coordinate