An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cost Allocation Considerations Herb Healy October 5, 2009

  2. Cost Allocation Considerations In ISO and EnerNOC supply-side proposal, energy payment levels differ • ISO • Pays LMP-G, where G is the cost of generation in the customer’s retail rate • EnerNOC • Pays LMP at or above a threshold price • Both ISO and EnerNOC require allocation of energy payments EnerNOC advocates • LMP – G allocated to the host LSE • LSE is held harmless by this payment structure (see following) • “G” portion of LMP payment is an uplift to Real Time Load Obligation (RTLO) • Prorate across all load

  3. Allocation of LMP-G Cost to Host LSE Scenario: Customer X has 1 MW of price-responsive load reduction LSE A is Asset Load owner for Customer X in ISO energy wholesale market Assume: --RT LMP = $80/MWh --Customer X retail rate for supply (G) = $60/MWh LSEA: Pays market (LMP-G) $20 Loses customer revenue (G) $60 Total cost $80 If LSEA is long: Sells 1 MWh @ LMP $80 revenue If LSEA is short: Avoids procurement of 1 MWh @ LMP ($80) avoided expense ISO $20 (=LMP-G) $20 (=LMP-G) LSEA Customer X ($60) (=Lost revenue to LSEA from Customer X) Host LSE held harmless by DR Participation

  4. Comments on ISO’s Draft Report“Evaluation of Demand Response Payments Rates and Cost Allocation Methods” • The paper illustrates and analyzes a valid cost allocation methodology • The methodology is applicable only to the particular, narrow example that is outlined in the document • ‘G’ – An ethereal concept. Difficult to determine in its simplest manifestation, widely divergent from a contractual and risk perspective for the vast majority of C&I loads • Use of study as basis for correct payment level is faulty • Study explicitly (and fatally) ignores DR’s marginal benefit to load, which is quite significant • Study assumes that the participation of DR in independent of the compensation price  • This proves…. if you pay less (for the same benefit), you are better off than paying more (for that same benefit)

  5. EnerNOC Proposed Additional Analysis • EnerNOC is not proposing a specific threshold today • Believe current DALRP threshold using 11.37 MMBtu/ kWh is too high • Proposes additional analysis • Potential savings to system, considering various levels of participation in the market • Appropriate heat rates indexed to FRFI • Look-back correction mechanism • Consideration of impacts of bidding parameter flexibility From EnerNOC presentation to MC, September 21, 2009 “Energy Market Construct for PRD -Payment Level, Threshold, and M&V”

  6. Example Benefit to Load – Draft Results • Basis of analysis • 100 MW of DR participation • Analysis shows: • DR will lower LMPs • Hourly benefits are highest in • high priced, scarcity hours, • But • Overall savings to load are • derived for higher levels of • participation