Proposal of Strategic Task Force - Making requirements to Smart Grid and LVDC -. Norimasa Minami Assistant secretary and TA9 Technical secretary. 2010-5-18. Contents 1, Current activities in IEC high level committees 1) SMB/SG1 ( Electrical Energy Efficiency)
E N D
Proposal of Strategic Task Force- Making requirements to Smart Grid and LVDC - Norimasa Minami Assistant secretary and TA9 Technical secretary 2010-5-18
Contents 1, Current activities in IEC high level committees 1) SMB/SG1 (Electrical Energy Efficiency) 2) SMB/SG2 (Ultra High Voltage) 3) SMB/SG3 (Smart Grid) 4) SMB/SG4 (Low Voltage Direct Current) 5) MSB/SWG 2, Scope in IEC 3, Impacts to TC100 1) Smart Grid 2) LVDC 3, About ad-hoc group 1) Objectives 2) Goal 3) Timeline 4) Members
1, Current activities in IEC high level committees 1) SMB/SG1 (Electrical Energy Efficiency) Created the below SGs 2) SMB/SG2 (UHV) Ultra high voltage transmission among the grids No impactto TC100 3) SMB/SG3 (Smart Grid) TC100 products are using electricity Impact to TC100 about from/to in-home, such as HEMS 4) SMB/SG4 (LVDC) TC100 products are driven by DC in its hardware Direct current inside home, not transmission outside 5) MSB/SWG EEE report mentioned new energy technologies In the future may be discussed
Generator Transmission Distribution In-home Generation 2, Scope in IEC Should be discussed on a sectoral basis network PV HVAC Data Centre A/V equipment Distribution Panel network Energy Management LVDC Substation Heat Pump Residential Battery FC Fridge EV
Air-conditioner Refrigerator Washing Machine Transformer Power Station heat pump AC 100-200V Microwave Oven AC 50/60Hz Induction Heater Storage Cell TV DVD/BD Audio Set LVDC 24~48V Photovoltaic PC Printer GameMachinei Phone/Fax Hybrid Control LED Lighting Sensorー Ventilation DC PLC Wireless Charger Electric Toothbrush Heat pump FC Bath Hydrogen Electric Shaver Kitchen Waste heated water Wash-basin 3, Impacts to TC100 1) Smart Grid (SG3) Electrical using equipments, HEMS, Smart meter, etc Energy Architecture in home (MSB-SWG report)
2) LVDC (SG4) All most of TC100 products are using DC Unification of voltage, plug, wall socket, wiring, accessories, etc
4, About a proposed task force(s) • Objectives • Survey and discussions of requirements to Smart Grid, LVDC • ex. Interfaces, Protocol, Voltage, and Safety issues • 2) Goal • Establishment of projects to make a standard related TC100 • 3) Timeline • 1st step : - December, 2010 • Survey the impact to TC100 by Smart Grid • 2nd step : 2011- depend on the SMB decisions in October • Discussions and making requirements to related TCs • Making standards related TC100 • 4) Members • Request to resister experts