60 likes | 624 Views
BUILDING CONSTRUCTION 1 – ARC 1523 Assignment 2 : Integrated Construction Detailing / Drawing. 116. Bevelled glazing cap. Construction Detail 1 : Curtain W all. 50. Sheet metal. Material used: Laminated glass Steel setting blocks Mineral wool insulator. Insulated façade panel.
E N D
BUILDING CONSTRUCTION 1 – ARC 1523 Assignment 2 : Integrated Construction Detailing / Drawing 116 Bevelled glazing cap Construction Detail 1 : Curtain Wall 50 Sheet metal Material used: Laminated glass Steel setting blocks Mineral wool insulator Insulated façade panel Double glazing 116 Double glazing Clamping section Post section 30 Floor plan Scale 1 :100 Insulating section 69 28 Section A Scale 1:20 Weatherstripping Screw Cover strip Construction Detail 2 : Aluminium framed window /glass panel 28 Connection of glass roof to glass wall , ridge connection Material used: 1.Aluminium 2.Tempered glass 3.Rubber welding Detail 1 Material used: Concrete reinforcement bar Welded mesh Setting block 4” cement floor slab Weatherstripping Construction Detail 3 : Strip foundation 8” concrete block wall 28 Connection of glass to glass (curtain wall), window glazing Detail 1 Double glazing Glazing bead Minimum 12” Ground level Section B Scale 1:20 Weatherstripping 77 91 Wall reinforcement Detail 2 20 Thermal break 3/8” links at 12” ctrs. 2 no. of ½” diameter bars The connection of glass panel with aluminium frame. The section shows the connection from head to cill Window frame 7” 9” Setting block 8” 8” 8” Edge tape Detail 3 Permanently elastic joint References: 1.Schittich, Staib,Balkow, Schuler & Sobek. (2008). Glass Construction Manual (2nded) . Edition Detail. 2.Foundation (http://www.buildingregs4plans.co.uk/foundation_floor_wall_3d_detail.php). 3.Australian Window association. (2006).Installation. Retrieved from http://www.valleywindows.com.au/documents/win_guide_Print2.pdf The strip foundation is basically a strip, or ribbon, of inside concrete running under all the loadbearing walls NAME : KHOO CHEE MEI ID : 0303125