1 / 4

KEK Hybrid Status

KEK Hybrid Status. Y. Unno , Y. Ikegami, et al. (KEK) D. Ferrere , S G.- Sevilla , et al. ( UniGe ). Hybrid status. 50 hybrids (7 :Geneva, 43 :KEK ) were successfully built. Unprobed Probed Total Dead Chip Rate 4.35% 0.13% 0.58% Dead Ch. Rate 4.37% 0.14% 0.60%.

makya
Download Presentation

KEK Hybrid Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. KEK Hybrid Status Y. Unno, Y. Ikegami, et al. (KEK) D. Ferrere, S G.-Sevilla, et al. (UniGe) 2011/7/13, Y. Unno

  2. Hybrid status 50 hybrids (7 :Geneva, 43 :KEK ) were successfully built. Unprobed Probed Total Dead Chip Rate 4.35% 0.13% 0.58% Dead Ch. Rate 4.37% 0.14% 0.60% 2011/7/13, Y. Unno

  3. We are planning to make four modules. The following modules were made by hand with fine adjustment. KEK #0 Sep. 09 Half-electrical (strip length test) KEK #1 Feb. 10 Powering scheme :Separated analog and digital inputs KEK #2 Apr. 10 Wrong combination of the sensors (Straight/Straight : Axial/Axial) and misalignment of hybrid KEK#3-#7 Now Being/to be assembled in industry To be used in the “Super module” test UniGe See report by Sergio G.-S. Module status 20-chips hybrid Double-sided module with 4 hybrids/80 chips 2011/7/13, Y. Unno

  4. ABCN13 Double-Side Module • Preliminary draft 2011/7/13, Y. Unno

More Related