30 likes | 131 Views
APEX Schedule May 11, 2011. Injection. Injection. Store. Store. Store. On/Off momentum beta beat, and beta* measurement Calaga, White, Luo, Bai. Spin Flipper Bai, Pablo, Oddo, Craig, Kevin. BBA Minty, Jordan, Liu, Rob, Rob, Kevin, …. ORM for GOFB Minty, Liu, Rob, Rob, Kevin, ….
E N D
APEX Schedule May 11, 2011 Injection Injection Store Store Store On/Off momentum beta beat, and beta* measurement Calaga, White, Luo, Bai Spin Flipper Bai, Pablo, Oddo, Craig, Kevin BBA Minty, Jordan, Liu, Rob, Rob, Kevin, … ORM for GOFB Minty, Liu, Rob, Rob, Kevin, … IPM calibration R. Connolly, Minty, Marusic IPM calibration R. Connolly, Minty, Marusic IP Transfer Matrix Tepikian, Ptitsyn 12am 1am 2am 5am 6am 8am
PHENIX delayed APEX for half hour • MCR informed experiments that store was scheduled to be dumped at 11:30pm, but, …. • Other than the first study which was delayed due to • PHENIX, no other failures and all others were kept on • schedule • IPM channel by channel calibration was also completed • details for each study will be reported in next week’s • time meeting Start of APEX
Plans for Next APEX, May 25, 2011 • 16 hours session from 8am till midnight • list of study candidates • test of dynamic beta* knob • IR non-linear correction • optics corrections • off-momentum beta-beat corrections • two independent methods • store working point scan • local decoupling • Beam-beam and space charge • 10 Hz GOFB for ramp • others…