1 / 3

APEX Schedule May 11, 2011

APEX Schedule May 11, 2011. Injection. Injection. Store. Store. Store. On/Off momentum beta beat, and beta* measurement Calaga, White, Luo, Bai. Spin Flipper Bai, Pablo, Oddo, Craig, Kevin. BBA Minty, Jordan, Liu, Rob, Rob, Kevin, …. ORM for GOFB Minty, Liu, Rob, Rob, Kevin, ….

malina
Download Presentation

APEX Schedule May 11, 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. APEX Schedule May 11, 2011 Injection Injection Store Store Store On/Off momentum beta beat, and beta* measurement Calaga, White, Luo, Bai Spin Flipper Bai, Pablo, Oddo, Craig, Kevin BBA Minty, Jordan, Liu, Rob, Rob, Kevin, … ORM for GOFB Minty, Liu, Rob, Rob, Kevin, … IPM calibration R. Connolly, Minty, Marusic IPM calibration R. Connolly, Minty, Marusic IP Transfer Matrix Tepikian, Ptitsyn 12am 1am 2am 5am 6am 8am

  2. PHENIX delayed APEX for half hour • MCR informed experiments that store was scheduled to be dumped at 11:30pm, but, …. • Other than the first study which was delayed due to • PHENIX, no other failures and all others were kept on • schedule • IPM channel by channel calibration was also completed • details for each study will be reported in next week’s • time meeting Start of APEX

  3. Plans for Next APEX, May 25, 2011 • 16 hours session from 8am till midnight • list of study candidates • test of dynamic beta* knob • IR non-linear correction • optics corrections • off-momentum beta-beat corrections • two independent methods • store working point scan • local decoupling • Beam-beam and space charge • 10 Hz GOFB for ramp • others…

More Related