An Overview of Activities and Opportunities in AfDB Financed Water and Sanitation in Ghana

An Overview of Activities and Opportunities in AfDB Financed Water and Sanitation in Ghana. Presentation to the Netherlands Business Forum The Hague, 16 February 2012. OUTLINE. Water Sector Challenges in Africa. AfDB’s Response. AfDB’s Response..…. ACCRA SEWERAGE IMPROVEMENT PROJECT.

marcus
Download Presentation

An Overview of Activities and Opportunities in AfDB Financed Water and Sanitation in Ghana

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. An Overview of Activities and Opportunities in AfDB Financed Water and Sanitation in Ghana Presentation to the Netherlands Business Forum The Hague, 16 February 2012

  2. OUTLINE

  3. Water Sector Challenges in Africa...

  4. AfDB’s Response

  5. AfDB’s Response..…

  6. ACCRA SEWERAGE IMPROVEMENT PROJECT • Objectives: (1) To provide an improved and extended sewerage and sanitation system for disposing of waste water from the city of Accra, in an environmentally and socially acceptable manner, to meet the demand up to year 2020; (ii) To strengthen the Accra Metropolitan Assembly (AMA) so that it can operate and maintain the system on a sustainable basis. • Outputs/Outcomes: • Infrastructure Construction of sewage treatment plants to treat 12,358m3 of sewerage effluent per day, rehabilitation and of 63.1km Sewerage Network and 147 public toilets and 37 septage reception tanks • Institutional Strengthening, Staff training and institutional strengthening of Accra Metropolitan Assembly, supply of sewer maintenance equipment • Project expected to impact 2.97 million people in the urban and peri urban areas of Accra. • Project Cost: The total cost of the project, net of taxes and customs, is UA 51.74 million

  7. BUSINESS OPPORTUNITIES ON THE ACCRA SEWERAGE IMPROVEMENT PROJECT • Construction of Sewerage system • Consultancy Supervision • Institutional Support Consultancy

  8. BUSINESS OPPORTUNITIES 2013-2018 • Consultancy • feasibility Studies and detailed designs • Construction Supervision • Audit services • Institutional Support • Goods • Office supplies and equipment • Vehicles • Works • Water Supply Infrastructure • Sanitation Infrastructure