Booster L12/Noker-L13/Absorber Update. PIP Update Talk August 15, 2012 Salah Chaurize. Current Status L12 Noker Systems. Tunnel Prep work 85% Complete
E N D
BoosterL12/Noker-L13/Absorber Update PIP Update Talk August 15, 2012 Salah Chaurize
Current StatusL12 Noker Systems • Tunnel Prep work 85% Complete • Two of three Noker kicker magnets have been rotated using new magnet angle brackets and end plates. Third magnet will be rotated this week. • Maintenance work in progress on kicker load resistors. • Charging resistor module need component fabrication. • L12 Noker power supply systems controls migration completed and tested. • Working on timing/trigger module installation for NokerThyratron firing. • New Thyratron cabinet construction in progress.
Noker and MKS04 Racks Before After
Load Resistors And Charging Resistor Box
Current StatusL13 Absorber Systems • Tunnel prep work 90% Complete • Floor and wall marking to be laid out to show foot print of K and L Blocks and wall shielding support section locations. • Small concrete blocks have been painted by AD Techs. • Machined Beam tube and liner components in hand at Meson Assembly Building. Preassemble of components in progress. • V. Sidorov is refining design details for aisle side beam kick configuration. • V. Sidorov is overseeing preassembly efforts by PPD Techs. So far parts are going together as planned. Liner parts are heavy precision milled components.